My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-05_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-11-05_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:05 PM
Creation date
11/6/2013 7:51:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/5/2013
Doc Name
Cost Estimate
From
DRMS
To
File
Type & Sequence
MR143
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 7 <br />BULLDOZER WORK <br />Task description: Regrade GVB, exploration and well pads and roads <br />Site: Bowie No. 2 Mine Permit Action: Minor Revision 143 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 345 State <br />Date: 11/5/2013 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation: None <br />Filename: C096 -345 <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 35,187 <br />Swell factor: 1.165 <br />Loose volume: 40,993 LCY <br />Source of estimated volume: DRMS - assume 1.5' material 14.54 acres (8.28 pad /6.26 <br />road) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient <br />Average site altitude: <br />Material weight <br />20% <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />7,725 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 35,187 <br />Swell factor: 1.165 <br />Loose volume: 40,993 LCY <br />Source of estimated volume: DRMS - assume 1.5' material 14.54 acres (8.28 pad /6.26 <br />road) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient <br />Average site altitude: <br />Material weight <br />20% <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />7,725 feet <br />2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.