Laserfiche WebLink
JD -6 Mine - Drainage Design Plan 68 <br />(e) JD -6 Mine UDS Profile P5 <br />\ \tsclient \D\ Projects \4148_JD_6 \SWMP_DDP \Channel \JD6UDS_l.out <br />Input File: \ \tsclient \D\ Projects \4148_JD_6 \SWMP_DDP \Channel \JD6UDS_5.sec <br />Run Date: 06/12/13 <br />Analysis Procedure: Hydraulics & Regression <br />Cross Section Number: 5 <br />Resistance Method: Thorne and Zevenbergen <br />D84: 25.000 mm <br />Q = aR "b a= 160.697586 b= 2.508362 r "2= 0.994968 n =42 <br />Q = aZ "b a= 27.947380 b =2.548 r "2= 0.979676 n =42 <br />STAGE AREA PERIM WIDTH R DHYD SLOPE n VAVG Q SHEAR FROUDE <br />(ft) (sq ft) (ft) (ft) (ft) (ft) (ft /ft) (ft /s) (cfs) (psf) <br />0.1 0.11 2.22 2.2 0.05 0.05 0.1027 0.065 1 0.11 0.32 0.7874 <br />0.2 0.39 3.14 3.08 0.12 0.13 0.1027 0.044 2.67 1.04 0.79 1.3273 <br />0.3 0.72 3.74 3.63 0.19 0.2 0.1027 0.038 4.19 3.03 1.24 1.6541 <br />0.4 1.11 4.14 3.95 0.27 0.28 0.1027 0.035 5.65 6.24 1.71 1.8810 <br />0.5 1.51 4.44 4.18 0.34 0.36 0.1027 0.033 6.98 10.56 2.18 2.0459 <br />0.6 1.94 4.75 4.41 0.41 0.44 0.1027 0.032 8 17 15.86 2.62 2.1703 <br />0.7 2.39 5.05 4.64 0.47 0.52 0.1027 0.031 9.25 22.14 3.04 2.2694 <br />0.8 2.87 5.36 4.86 0.54 0.59 0.1027 0.031 10.24 29.38 3.43 2.3512 <br />0.9 3.37 5.66 5.09 0.59 0.66 0.1027 0.030 11.17 37.59 3.81 2.4207 <br />1 3.89 5.97 5.32 0.65 0.73 0.1027 0.030 12.03 46.76 4.17 2.4810 <br />1.1 4.43 6.27 5.55 0.71 0.8 0.1027 0.029 12.85 56.92 4.53 2.5341 <br />1.2 5.00 6.58 5.78 0.76 0.86 0.1027 0.029 13.62 68.07 4.87 2.5817 <br />1.3 5.59 6.87 5.99 0.81 0.93 0.1027 0.029 14.38 80.34 5.21 2.6241 <br />1.4 6.19 7.13 6.15 0.87 1.01 0.1027 0.029 15.15 93.82 5.57 2.6609 <br />1.5 6.82 7.39 6.32 0.92 1.08 0.1027 0.028 15.88 108.25 5.91 2.6940 <br />(0 JD -6 Mine UDS Profile P6 <br />\ \tsclient \D \Projects \4148_JD_6 \SWMP_DDP \Channel \JD6UDS_l.out <br />Input File: \ \tsclient \D\ Projects \4148_JD_6 \SWMP_DDP \Channel \JD6UDS_6.sec <br />Run Date: 06/12/13 <br />Analysis Procedure: Hydraulics & Regression <br />Cross Section Number: 6 <br />Resistance Method: Thorne and Zevenbergen <br />D84: 25.000 mm <br />Q = aR"b a= 110.456032 b= 2.848960 r "2= 0.996759 n =56 <br />Q = aZ "b a= 6.698027 b =2.891 r "2= 0.984782 n =56 <br />STAGE AREA PERIM WIDTH R DHYD SLOPE n VAVG Q SHEAR FROUDE <br />(ft) (sq ft) (ft) (ft) (ft) (ft) (ft /ft) (ft /s) (cfs) (psf) <br />0.1 0.02 0.44 0.39 0.04 0.05 0.0633 0.066 0.71 0.01 0.17 0.5605 <br />0.2 0.08 0.87 0.77 0.09 0.1 0.0633 0.048 1.54 0.12 0.35 0.8585 <br />0.3 0.17 1.31 1.16 0.13 0.15 0.0633 0.041 2.4 0.42 0.52 1.0927 <br />0.4 0.3 1.65 1.44 0.18 0.21 0.0633 0.037 3.29 1 0.73 1.2622 <br />0.5 0.46 1.99 1.71 0.23 0.27 0.0633 0.035 4.08 1.88 0.91 1.3842 <br />0.6 0.65 2.33 1.99 0.28 0.33 0.0633 0.033 4.79 3.1 1.09 1.4800 <br />0.7 0.86 2.67 2.26 0.32 0.38 0.0633 0.032 5.46 4.68 1.27 1.5595 <br />0.8 1.1 3.01 2.53 0.36 0.43 0.0633 0.031 6.08 6.68 1.44 1.6276 <br />0.9 1.36 3.35 2.8 0.41 0.49 0.0633 0.031 6.68 9.12 1.61 1.6874 <br />1 1.66 3.65 3.02 0.45 0.55 0.0633 0.03 7.3 12.11 1.79 1.7387 <br />1.1 1.97 3.92 3.21 0.5 0.61 0.0633 0.03 7.92 15.6 1.98 1.7819 <br />1.2 2.3 4.2 3.39 0.55 0.68 0.0633 0.03 8.5 19.55 2.16 1.8198 <br />1.3 2.65 4.47 3.57 0.59 0.74 0.0633 0.029 9.05 23.96 2.34 1.8535 <br />1.4 3.01 4.74 3.76 0.64 0.8 0.0633 0.029 9.57 28.85 2.51 1.8840 <br />1.5 3.4 5.02 3.94 0.68 0.86 0.0633 0.029 10.08 34.24 2.68 1.9120 <br />1.6 3.8 5.29 4.12 0.72 0.92 0.0633 0.028 10.56 40.14 2.84 1.9377 <br />1.7 4.22 5.56 4.31 0.76 0.98 0.0633 0.028 11.02 46.55 3 1.9617 <br />1.8 4.66 5.84 4.49 0.8 1.04 0.0633 0.028 11.47 53.5 3.16 1.9842 <br />1.9 5.12 6.11 4.67 0.84 1.1 0.0633 0.028 11.91 61 3.31 2.0053 <br />2 5.6 6.38 4.86 0.88 1.15 0.0633 0.028 12.34 69.07 3.46 2.0253 <br />2.1 6.09 6.66 5.04 0.92 1.21 0.0633 0.028 12.75 77.71 3.62 2.0442 <br />2.2 6.61 6.93 5.23 0.95 1.26 0.0633 0.028 13.16 86.94 3.77 2.0623 <br />2.3 7.14 7.2 5.41 0.99 1.32 0.0633 0.027 13.56 96.78 3.91 2.0796 <br />4148A.131028 Whetstone Associates 6 <br />