My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-05_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2013-11-05_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:36:54 PM
Creation date
11/5/2013 2:16:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
11/5/2013
Doc Name
TR-32 Response Plan- Monitoring Well M-14 Results.
From
Battle Mountain Resources, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Battle Mountain Resources, Inca <br />San Luis Project <br />P.O. Box 310 <br />San Luis, Colorado 81152 -0310 <br />(719) 379 -0798 <br />October 31, 2013 <br />/Mr. Wally Erickson <br />Colorado Department of Reclamation, Mining, & Safety <br />1313 Sherman, Room 215 REECEIVED <br />Denver, CO 80203 <br />Re: Battle Mountain Resources, Inc. �'-n n n 5 2013 <br />San Luis Project — Permit No.M -88 -112 <br />TR =32 Response Plan - Monitori�Wei M -14 Results Division of Reclamation <br />— - - Mining & safety <br />Dear Mr. Erickson: <br />As outlined in the TR -32 Response Plan for monitoring well M -14, dated August 28, 2013, BMRI <br />collected samples on September 25, 2013 and October 8, 2013 utilizing the micro purge sampling <br />technique. Samples were collected at monitoring well M -14 with the pump intake located at or slightly <br />above the middle of the screened interval and drawn directly from the formation with little mixing of <br />casing water or disturbance to the sampling zone. The enclosed report summarizes the analytical results <br />for samples collected at approximately 165 feet, which is the middle of the screened interval for M -14. <br />Samples were analyzed for the on -site ground water well quality parameters listed in Table 24 of TR -32 <br />as noted in the Response Plan. <br />BMRI will continue to collect samples on a bi- monthly basis for TDS and on a monthly basis for the on- <br />site ground water well quality parameters listed in Table 24 of TR -32 as outlined in the Response Plan. <br />Should the Division have any questions or require any clarifications regarding this correspondence, please <br />notify me at (719) -0538. <br />i cerely, <br />J lio Madrid <br />A thorized Agent <br />Battle Mountain Resources, Inc. <br />Cc: BMRI File <br />Lawrence Fiske, Newmont USA Limited <br />Tim Runnells, AESI <br />
The URL can be used to link to this page
Your browser does not support the video tag.