Laserfiche WebLink
Loader Worksheet Cont'd Task # 001 Page 2 of 2 <br />Total Travel Time: <br />Total Cycle Time: <br />Load Bucket Canaci <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 0.875 Blasted rock - well blasted <br />Adjusted Capacity: 3.41 LCY <br />Job Condition Correction Factors <br />Site Altitude: 10800 feet <br />Source <br />Altitude Adj: 0.92 CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.76 multiplier <br />Unadjusted Hourly Unit Production: 236.30 <br />Adjusted Hourly Unit Production: 180.44 <br />Adjusted Hourly Fleet Production: 360.88 <br />JOB TIME AND COST <br />0.3740 <br />0.8665 <br />-95%)0.875 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />minutes <br />minutes <br />Fleet size: 2 Loader(s) Total job time: 12.47 Hours <br />Unit cost: $0.527 /LCY Total job cost: $2,370.00 <br />CIRCES Cost Estimating Software <br />