Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 014 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />DURANGO <br />Total one -way travel distance: <br />20.00 miles <br />Average Travel Speed: <br />25.00 mph <br />Total Non - Roadable Mob /Demob Cost * <br />`* <br />$4,465.02 <br />two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$127.44 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.80 <br />0.80 <br />0.80 <br />0.80 <br />1.00 <br />NA <br />1.00 <br />NA <br />3.60 <br />1.60 <br />Total job time: 7.20 Hours <br />Total job cost: $4,592.46 <br />CIRCES Cost Estimating Software <br />