My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-29_REVISION - M1986076 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986076
>
2013-10-29_REVISION - M1986076 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:28 AM
Creation date
11/5/2013 9:46:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986076
IBM Index Class Name
REVISION
Doc Date
10/29/2013
Doc Name
FINANCIAL WARRANTY INCREASESI02
From
DRMS
To
DGMC
Type & Sequence
SI2
Email Name
KAP
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Incas Mine <br />PROJECT IDENTIFICATION <br />DEMOLITION WORK <br />Dispose f backfill devris, remove chemicals and containers <br />Permit Action: 2013 Inspection Permit/Job #: M1986076 <br />Task #: 012 State <br />Date: 11/23/2012 County <br />User: KAP <br />Agency or organization name: <br />UNIT COSTS <br />Colorado <br />La Plata <br />DRMS <br />Abbreviation: None <br />Filename: M076 -012 <br />Location adiustment: 94.00 % <br />Structure or Item <br />Description <br />Dimensions <br />Demolition Menu <br />Selection <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Cost <br />Surface piping <br />50OLF x 1" <br />Push demolished <br />500.00 <br />CY <br />$0.47 <br />$234.00 <br />(waster supply) <br />diam, plastic <br />materials /rubble /debris <br />into pit -Max. 100 ft. <br />ush <br />Above ground wiring <br />1000 LF plus <br />Push demolished <br />1,000.00 <br />CY <br />$0.47 <br />$468.00 <br />supports <br />materials /rubble /debris <br />into pit -Max. 100 ft. <br />ush <br />Misc. equipment <br />10'x 10'x 20' <br />Push demolished <br />74.00 <br />CY <br />$0.47 <br />$34.63 <br />parts <br />materials /rubble /debris <br />into pit - Max. 100 ft. <br />push <br />Opened container <br />2 55 -gal. drums <br />Hazardous waste <br />2.00 <br />DRUM <br />$441.13 <br />$882.26 <br />processing chemicals <br />removal - Drum <br />solids /liquids, per drum, <br />(1 -6 drum job) <br />Sludges, residue, <br />2 55 -gal. drums <br />Hazardous waste <br />2.00 <br />DRUM <br />$441.13 <br />$882.26 <br />solvents, mill circuit <br />removal - Drum <br />solids /liquids, per drum, <br />(1 -6 drum job) <br />Subtotal <br />Job Hours: 10.00 (unadjusted): $2,501.15 <br />Total Cost <br />(adjusted for <br />location): $2,351.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.