Laserfiche WebLink
Task description: Bond Increase <br />Site: Incas Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: 2012 Inspection Permit/Job #: M1986076 <br />Task #: 000 State: Colorado <br />Date: 11/23/2012 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M076 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />010 <br />011 <br />012 <br />014 <br />015 <br />Backfill and Grade compact open pit area, first <br />phase <br />LOADER <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />12.47 <br />$2,370.00 <br />$1,701.00 <br />$2,684.00 <br />$188.00 <br />$431.00 <br />$1,788.00 <br />$380.00 <br />$114.00 <br />$1,415.48 <br />$3,462.94 <br />$2,351.08 <br />$4,592.46 <br />$263.00 <br />Grade or cmpact contour depression fill area, first <br />phase <br />LOADER <br />8.95 <br />Grade and rip reworekd mine dump areas, first <br />phase <br />EXCAVATE <br />27.13 <br />Grade and rip stormwater controls, first phase <br />EXCAVATE <br />1.89 <br />Grade and contur non- ermenant roads, first phase <br />EXCAVATE <br />4.36 <br />INstall contour furrows on slopes, first phase <br />EXCAVATE <br />18.07 <br />Replace topsoil over graded open pit area, first <br />phase <br />LOADER <br />2.00 <br />Replace topsoil over graded contour depression, <br />first phase <br />LOADER <br />0.60 <br />Seal existing underground openings <br />MINESEAL <br />0.00 <br />Reve etate <br />REVEGE <br />0.00 <br />Dispose f backfill devris, remove chemicals and <br />containers <br />DEMOLISH <br />10.00 <br />Mobilize/Demobilize <br />MOBILIZE <br />7.20 <br />Circuit Detox <br />VATDETOX <br />4.92 <br />SUBTOTALS: <br />97.59 <br />$21,740.96 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00% <br />Total = <br />$0.00 <br />Performance bond: 0.00% <br />Total = <br />$0.00 <br />Job superintendent: 49.98 hrs <br />Total = <br />$3,269.19 <br />Profit: 10.00% <br />Total = <br />$2,174.10 <br />TOTAL O & P = <br />$5,443.29 <br />CONTRACT AMOUNT (direct + O & P) = <br />$27,184.25 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />10.00% <br />Total = <br />$2,718.43 <br />Reclamation management and /or administration: <br />0.00% <br />$0.00 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />