Laserfiche WebLink
Loader Worksheet Cont'd Task # 007 <br />Total Travel Time: 0.3740 <br />Total Cycle Time: 0.8665 <br />Load Bucket Capacity <br />Rated Capacity: 3.90 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100 -120 %) 1.100 <br />Adjusted Capacity: 4.29 LCY <br />Job Condition Correction Factors <br />Site Altitude: 10800 feet <br />Source <br />Altitude Adj: 0.92 CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.76 multiplier <br />Unadjusted Hourly Unit Production: 297.07 <br />Adjusted Hourly Unit Production: 226.84 <br />Adjusted Hourly Fleet Production: 453.68 <br />JOB TIME AND COST <br />Fleet size: 2 Loader(s) Total job time: <br />Unit cost: $0.419 /LCY Total job cost: <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Page 2 of 2 <br />minutes <br />minutes <br />2.00 Hours <br />$380.00 <br />CIRCES Cost Estimating Software <br />