Laserfiche WebLink
Task description: <br />Site: Incas Mine <br />HYDRAULIC EXCAVATOR WORK <br />Grade and contur non - permenant roads, first phase <br />Permit Action: 2013 Inspection Permit/Job #: M1986076 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 11/23/2012 County: La Plata <br />User: KAP <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 319D L 8' -10" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $23.18 NA <br />Operating Cost/Hour: $41.78 100 <br />Operator Cost/Hour: $33.94 NA <br />Total Unit Cost/Hour: 598.91 <br />Abbreviation: None <br />Filename: M076 -005 <br />Horsepower: <br />125 <br />Weight (MT): <br />19.55 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Total Fleet Cost/Hour: $98.91 <br />MATERIAL QUANTITIES <br />Initial volume: 446 CCY Swell factor: 1.000 <br />Loose volume: 446 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded dump bucket swing emm): <br />Basic Job Condition Description: AVERAGE <br />Secondary Job Condition within Basic Description: AVERAGE <br />Cycle Time Value: 0.282 minutes <br />Load Bucket Capacity <br />Rated Capacity: 1.10 LCY (heaped) <br />Bucket Fill Factor: 0.675 Rock - Well blasted <br />Adjusted Capacity: 0.74 LCY <br />Job Condition Correction Factors <br />Source <br />Altitude Adj: 0.78 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.65 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />157.98 <br />102.28 <br />102.28 <br />Fleet size: 1 Excavator Total job time: <br />Unit cost: $0.967 /LCY <br />Bucket Size Class: Medium <br />-75%)0.675 <br />Site Altitude: 10800 feet <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />4.36 <br />Total job cost: $431.00 <br />Hours <br />CIRCES Cost Estimating Software <br />