My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C2010089 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2010089
>
_INSPECTION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 8:49:00 AM
Creation date
10/31/2013 1:01:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
David Anderson
Inspection Date
10/29/2013
Email Name
MPB
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 29,2013 C-2010-089/New Horizon North Mine MPB <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection Y -Roads <br /> N -Availability of Records NA -Reclamation Success <br /> NA -Backfill& Grading NA -Revegetation <br /> NA -Excess Spoil and Dev. Waste NA - Subsidence <br /> N -Explosives NA - Slides and Other Damage <br /> N -Fish&Wildlife Y - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> NA -Processing Waste Y -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the New Horizon North Mine conducted on October 29,2013 by Mike Boulay of <br /> the Division of Reclamation,Mining and Safety Grand Junction Field Office. Ross Gubka and David Anderson of <br /> Western Fuels-Colorado and Chris Gilbreath of Tri-State Generation and Transmission Association,Inc. (Tri- <br /> State)were present during the entire inspection. Weather conditions were cold and raining. Ground conditions <br /> were wet. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> We inspected the perimeter of the site and the active pit area. The overburden stockpile (see Photograph No. 1) <br /> and the 2 topsoil stockpiles were inspected at the southern limit of the site. As seen in Photo No. 1,the bench 2 <br /> material is placed on top of bench 1 one overburden. Pond 001 (see photograph No. 2)is fully functional and was <br /> retaining some water well below the level of the principal spillway at the time of the inspection. Perimeter ditches <br /> were well constructed and functional. Overburden was being loaded and hauled from the pit with haul truck and <br /> shovel. A small coal stockpile is located to the northwest of the pit. A wide angle view of the current active pit is <br /> shown in Photograph No. 3. Site activities viewed during this inspection are in compliance with the mine plan and <br /> no problems were identified during this inspection. <br /> DOCUMENTS RECEIVED <br /> None <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: I <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.