My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-28_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-10-28_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:32 PM
Creation date
10/30/2013 1:07:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/28/2013
Section_Exhibit Name
Volume III Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources LLC <br />Permit No. 04DLO560 <br />Initial Approval <br />oa4e 3 <br />rei <br />Cl <br />e <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />Written notification of construction and initial startup dates shall be submitted to <br />the Division as required under § 60.7. <br />Records of startups, shutdowns, and malfunctions shall be maintained, as <br />required under § 60.7. <br />Compliance with opacity standards shall be demonstrated according to § 60.11 <br />9. Within one hundred and eighty days (180) after commencement of operation, compliance with the <br />conditions contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate compliance <br />within 180 days may result in revocation of the permit. (Information on how to certify compliance <br />was mailed with the permit or can be obtained from the Division at 303 - 692 - 3209.) <br />R K Hancock III of d C. Hea, P.E. <br />Permit Reviewer Unit Leader <br />Notes to Permit Holder: <br />1) The production or raw material processing limits and emission limits contained in this permit are <br />based on the production /processing rates requested in the permit application. These limits may <br />be revised upon request of the permittee providing there is no exceedence of any specific <br />emission control regulation or any ambient air quality standard. A revised air pollution emission <br />notice (APEN) and application form must be submitted with a request for a permit revision. <br />2) This source is subject to the Common Provisions Regulation Part II, Subpart E, Upset Condition <br />and Breakdowns. The permittee shall notify the Division of any upset condition which causes a <br />violation of any emission limit or limits stated in this permit as soon as possible, but no later thar <br />two (2) hours after the start of the next working day, followed by written notice to the Division <br />explaining the cause of the occurrence and that proper action has been or is being taken to <br />correct the conditions causing said violation and to prevent such excess emission in the future. <br />iF <br />X: <br />3) In accordance with C.R.S. 25 -7- 114.1, the Air Pollutant Emission Notice (APEN) associated with <br />this permit is valid for a term of five years. The five year term for the APEN received with this <br />permit application expires on April 19, 2005. A revised APEN shall be submitted no later than 30 <br />days before the five year term expires. <br />4) This source is classified as a: Minor Source <br />At a: Synthetic Minor Facility <br />r <br />029/0049/017 <br />` ver. 2/00 <br />w M <br />
The URL can be used to link to this page
Your browser does not support the video tag.