My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-28_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2013-10-28_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:32 PM
Creation date
10/30/2013 1:07:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/28/2013
Section_Exhibit Name
Volume III Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />oF.co� <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT <br />AIR POLLUTION CONTROL DIVISION <br />TELEPHONE: (303) 692 -3150 ' <br />�lgy6 � <br />CONSTRUCTION PERMIT <br />PERMIT NO: 03DLO923F <br />INITIAL APPROVAL <br />DATE ISSUED: September 27, 2006 MODIFICATION - 2 <br />ISSUED TO: Bowie Resources, LLC <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Surface activities to support underground coal mining at Bowie No. 2 Mine, <br />located approximately 4 miles east of Paonia, in Delta County, Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Coalmine waste (gob) handling, hauling, stockpiling, and reclamation activities. <br />THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO <br />AIR QUALITY CONTROL COMMISSION AND THE COLORADO AIR POLLUTION PREVENTION <br />AND CONTROL ACT C.R.S. (25 -7 -101 ems), TO THOSE GENERAL TERMS AND CONDITIONS <br />INCLUDED IN THIS DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />All previous versions of this permit are canceled upon issuance of this permit. <br />Within one sixty (60) days after issuance of this permit, compliance with the conditions <br />contained on this permit shall be demonstrated to the Division. It is the permittee's <br />responsibility to self certify compliance with the conditions. Failure to demonstrate <br />compliance may result in revocation of the permit. (Information on how to certify <br />compliance was mailed with the permit.). A plan of action required under Control <br />Measures shall accompany the self - certification. <br />The particulate emission control measures listed on the attached page (as approved by the <br />Division) shall be applied to the particulate emission producing sources as required by <br />Regulation No. 1, Section III.D.l.b. <br />This permit is for materials handling related activities only; any process equipment (i.e. <br />crushers, screens, etc.) to be located at this site must have a separate permit from the <br />Division. (Reference: Regulation No. 3. Part B. Section III.E.) <br />AIRS Point ID: 029; 0049:016 Page 1 of <br />mR -9n <br />APfP,avccD g�Zn�o <br />
The URL can be used to link to this page
Your browser does not support the video tag.