Laserfiche WebLink
• ATTACE MENT A <br />Table of Content <br />• Initial Fill Sequence Channel Design Hydrologic Inputs <br />• Postmine Channel Design Hydrologic Inputs, <br />• Postmine Channel RDA -1 System (includes Channels RDA -lb, RDA -lc, RDA -1d, RDA -le, <br />RDA -lf and RDA -3 and Bench Ditches BD -4L, BD -5L and BD -6L) <br />• Temporary Ditch RDA-4 (10 -year, 24 -hour storm event) <br />• Temporary Ditch RDA-4a (10 -year, 24 -hour storm event) <br />• Channel RDA- 4/RDA -5 System (100 -year, 24 -hour storm event [demonstration for Ditch <br />Design in case construction stops after Initial Fill Sequence]) <br />• Postmine Channel RDA -5 System (includes Channels RDA -5a, RDA -5b and RDA -5c and <br />Bench Ditches BD -3, BD -4R, BD -5R and BD -6R) <br />• Postmine Channel RDA -6 (includes Bench Ditches BD -1 and BD -2) <br />• Postmine Channel RDA -7 <br />• Temporary Ditch RDA -10 (10 -year, 24 -hour storm event) <br />• Temporary Ditch RDA- 11(10 -year, 24 -hour storm event) <br />CJ <br />0 <br />