My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-17_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-10-17_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:34 PM
Creation date
10/30/2013 9:28:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/17/2013
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Minimizing the area of surface disturbance Scheduling of construction activities during the dry summer or <br />early winter periods <br />• Placement of staked straw wattles downgradient of all surface disturbance areas to intercept any surface runoff <br />• and trap associated suspended solids <br />• Installation of the Foidel Creek, RCR27, and railroad spur pipeline crossings as either trenched or bored/jacked <br />pipeline crossings under Foidel Creek, RCR27 and the railroad spur (if trenched, TC will obtain required <br />CDPHE -WQCD Temporary Construction Discharge Permit and will complete required USACE notification <br />• Soil replacement and stabilization with either the standard rangeland or riparian seed mixtures (as appropriate) <br />in a timely manner following completion of construction activities <br />Construction- related surface disturbance will be limited to soil removal and windrowing from the pipeline trench <br />alignments and stockpiling for the borehole pad areas, excavation of the trenches and temporary stockpiling of <br />excavated material adjacent to the trenches, minor cut/fill grading to establish the borehole drill-pads and excavation of <br />temporary cuttings pits, and excavation of temporary pits (within existing disturbance areas) for pipeline boring or <br />jacking operations at the Foidel Creek, RCR27, and railroad spur pipeline crossings. <br />Where pipeline disturbance traverses steep slopes, additional staked straw wattles will be placed on- contour to limit <br />overland flow following revegetation seeding. Drainage and sediment control for the associated minor surface <br />structures (borehole surface casings and any manhole(s)) will also utilize BMP's including the vegetative filter <br />provided by temporary vegetative stabilization, and berms and/or wattles, as appropriate. The pad and access road for <br />the 6RT Thickener Underflow Borehole installation have been designated as a Small Area Exemption (SAE), and.the <br />limited drainage from this area will be controlled by gravel surfacing, staked straw wattles, and <br />reclamation/stabilization of the pad area following well installation. SAE designs for the 6RT Installation are provided <br />in Exhibit 49S, and include upstream and downstream straw bale catch dams for any trenching activities. Temporary <br />drainage and sediment control measures will remain in -place until vegetation is sufficiently established to effectively <br />control runoff, erosion, and sediment loss. <br />•As relatively small isolated surface disturbances, the additional disturbance required to construct ditches and <br />sedimentation ponds to intercept, route, and treat runoff from thickener underflow pad and road areas, is not warranted. <br />Similarly, for the associated temporary linear pipeline disturbances, construction of ditches and ponds to control runoff <br />is impractical. Much of the EMD Thickener Underflow Pipeline disturbance will drain naturally to existing <br />Sedimentation Ponds E, F, and G, and the majority of the drainage from pipeline areas is effectively isolated from the <br />nearest drainage ( Foidel Creek) by the existing raised railroad bed. The proposed BMP's have proven effective in <br />controlling runoff and sedimentation from similar disturbances. Special design, construction, and operational measures <br />have been incorporated in the design plans to assure that there will be no discharge or mixing of mine water with <br />surface drainage. <br />Following installation of appropriate ASC's for each portion of the project disturbance, available soil materials will be <br />bladed from any new disturbance areas and temporarily windrowed or stockpiled on the upgradient edge of these <br />disturbance areas. Much of the pipeline excavation and borehole pad disturbance will occur in areas that are, or have <br />previously been, disturbed. For the remaining pipeline trench areas, consideration of soil horizon segregation must be <br />balanced with the objective of limiting overall surface disturbance. In the interest of minimizing overall surface <br />disturbance, TCC proposes to not segregate and separately stockpile individual soil horizons for the pipeline trench <br />disturbance, and submits that this approach will not significantly alter soil suitability characteristics, since the <br />differences between the soil horizons is not significant over the areas to be affected by trenching. For the borehole <br />drill -pads, individual soil horizons will be segregated, if present. Generally, to avoid contamination of the windrowed <br />soil material, excavated material will be temporarily placed on the opposite side of the disturbance area. <br />Soil materials will be replaced following completion of pipeline installation. Reseeding of the disturbed areas will <br />be completed during the first appropriate planting period following soil material replacement. When no longer <br />needed to support ongoing or future mining and related operations, the thickener underflow boreholes will <br />•reclaimed by removing the surface manhole structures; plugging and sealing the boreholes, consistent with State <br />Engineer requirements; cutting -off the casings below ground level, and placing a permanent marker; then <br />regarding, replacing soil materials, and reseeding the associated disturbance areas. Pipelines will be abandoned in- <br />place, with the ends of the pipelines cut -off and capped below grade. <br />TRI I -77 2.05 -84.6 07/20/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.