(D) Monitoring of established monuments and structures shall be performed at <br />least quarterly, commencing one month prior to the initiation of mining beneath any established monument or <br />structure. <br />(E) Results of the monitoring program shall be submitted to the Division at <br />least semi - annually. <br />(F) The monitoring program shall be designed to extend for a time, beyond <br />cessation of mining an any area, consistent with the need for verification of the subsidence prediction. <br />(ii) The application shall include an appropriate map, prepared according to the standards <br />of Section 2.10 showing the location of monuments to be installed and structures to be monitored within the <br />permit and adjacent area. <br />R F CP(INCR <br />Prior to panel development below the Twentymile Sandstone, a subsidence monitoring program will be <br />initiated to provide quantitative data regarding potential subsidence above underground workings. <br />Monuments will be installed to a depth below the frost line, to avoid frost heave damage, and shall be <br />constructed to an approved standard. The location of monuments are shown on the five year mine plan <br />map, Map 23A. The monuments have been designed to fulfill the following requirements: <br />Above Main Entries <br />Monuments have been installed at 100 foot intervals along the center line of the main entries in the <br />location of Foidel Creek. <br />The data gathered from the subsidence network installed over the main entries along Foidel Creek <br />demonstrates that subsidence has not occurred in this area. Because of this, monuments FC -2, FC -3 and <br />FC -4 have been deleted from the subsidence monitoring plan. <br />Since subsidence has not occurred within the Foidel Creek Area, TCC does not intend to establish <br />monuments over main entries which will be driven under Fish Creek. <br />2. Above Production Panels <br />In reference to 1st Panel South, two lines of monuments have been installed as shown on Map 23A, Five <br />Year Mine Plan. The maximum spacing between adjacent monuments in the same line is 100 feet or <br />approximately 10% of the overburden depth. Spacing has been narrowed to 50 feet on the east side of the <br />panel to better define the angle of draw. One line will be along the centerline parallel to the long axis of <br />the panel. A second line will be transverse to the long axis of the panel. The lines will extend beyond the <br />panel area to fully cover the area within the maximum possible angle of draw. The steep cliffs formed by <br />the Twentymile Sandstone may make some sites inaccessible. <br />As indicated by the semi- annual monitoring extraction area of 1st Panel South. However, since the <br />extent of subsidence has stabilized, these monuments (SM -7 through SM -41, inclusive) will be deleted <br />from the monitoring plan as of 1 st quarter, 1989. <br />MR 97 -154 2.05-185 9/9/97 <br />