My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-17_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-10-17_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:34 PM
Creation date
10/30/2013 9:28:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/17/2013
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
where the railroad passes over the mine workings. The location of the rail line is shown on Map 23B, Structures <br />and Renewable Resources <br />The worst -case impacts, due to subsiding the railroad track, could result in a train derailment. In the unlikely <br />event that this should occur, the coal spilled from the cars would be cleaned -up to the extent practical. The coal <br />would be either returned to the car or hauled back to TC's facility. In the event this occurred during an <br />inclement period and ground conditions did not allow for the clean -up, the coal would be cleaned -up during the <br />next favorable period. TC does not plan to construct any permanent roads to facilitate possible clean -up. The <br />required mobile equipment (i.e. trucks and loaders) would drive over the tracks or immediately adjacent to the <br />track -bed. The potential clean -up would be limited to periods of favorable field conditions, thereby reducing the <br />chance that a road will have to be constructed into the clean -up site. A copy of the subsidence agreement <br />between TC and the railroad is incorporated into Exhibit 7D -1. Any additional agreement letters from different <br />parties will also be incorporated into this exhibit (7D -1). <br />There are two locations where the track crosses Fish Creek which will require placement of additional fill at <br />these crossings. It is anticipated that periodic clean -up of materials from the UP's normal track maintenance <br />activities may be required. This work will be coordinated through the UP. <br />During mining of the 9, 8, 7, 12, 13 and 14 -Right panels, the railroad track was subsided, without causing any <br />derailments or other material damage. The track subsided as predicted and the agreed upon repair /maintenance <br />plan was carried out without any significant problems. The track will be subsided during mining of Panels 17- <br />and 18- Right, with similar effects and maintenance requirements anticipated. <br />Fish Creek <br />Fish Creek flows in a generally northerly direction through the NMD and northwesterly, through portions of the <br />WMD. The overburden depth varies from 1,000 to 1,400 feet through the panels. The location of the creek is <br />shown on Map 23B, Structures and Renewable Resources. <br />Projected impacts to the creek are presented in Exhibit 7e -6, Twentymile Coal Company, AVF Subsidence <br />Study, Final Report, prepared by SubTerra, Inc. As noted in this exhibit, subsidence varies from 0 to 67 inches <br />over the panels. Based on the data presented in Exhibit 7e -6, the maximum increase in the stream gradient is l .1 <br />percent. It is not anticipated this will cause significant changes to the creek's profile, and resultant erosion <br />should not be a concern. TC has monitored similar changes in gradient in the EMD and NMD, without resultant <br />erosional problems in Fish, Foidel, or Middle Creeks. The same type of subsidence features will occur along <br />Fish Creek, i.e. trough - subsidence features, with differential lowering of the ground surface, minor surface <br />cracks, and localized ponding or minor flooding (during high flow periods) over the panels. Natural ponding <br />will tend to mitigate any localized changes in stream gradient, as flow velocities will be reduced as streamflows <br />pass through the ponded areas. The extent of ponding, i.e. flooding of AVF, is presented in Exhibits 7e -6 <br />(NMD) and 25Y (WMD). As indicated in these exhibits, approximately 7.3 acres will be flooded by the mining <br />of Panels 17 -Right and 18- Right, and a maximum of approximately 39.9 acres would be flooded during high <br />water by mining Panels 12- through 16 -Left. <br />Prior to full extraction under the creek, a channel survey was completed in the NMD to establish the baseline <br />used in the preparation of the Probable Hydrologic Consequences section of this application. Given, however, <br />TC's experience with subsidence effects on Fish Creek and Foidel and Middle Creeks, it was not considered <br />necessary to survey the Fish Creek channel in the WMD, as the dynamics of stream subsidence in this area are <br />already well - established. <br />Fish Creek Alluvial Valley Floor <br />The Fish Creek Alluvial Valley Floor will be undermined and subsided during mining of Panels 17 -Right and <br />18 -Right in the NMD, and Panels 12- through 15 -Left in the WMD. Subsidence for the AVF will mirror that <br />projected for the creek. The primary impact anticipated for the AVF is localized temporary pooling of water in <br />the subsidence troughs over the mined panels and their associated subsidence areas. <br />TR 13 -82 2.05 - 181.10 02/28/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.