Laserfiche WebLink
(b) If this information is not available from those agencies, the applicant may gather and submit <br />this information to the Division as part of the permit application. <br />(c) The permit shall not be approved by the Division until this information is made available in <br />the application. <br />RESPONSE <br />This application contains comprehensive and detailed descriptions and maps concerning the geology and hydrology of <br />the proposed permit area, adjacent area, and the general area. The definitions of these areas, as contained in Rule <br />1.04, have been applied in what TCC believes to be a reasonable manner to the lands surrounding the planned mining <br />operation. The permit area contains all lands on which the operator will conduct mining operations during the term of <br />the permit. The adjacent area covers lands and resources outside the permit area which may be adversely affected by <br />mining operations. The general area includes the topographic and ground water basin surrounding the area to be <br />mined, including one or more watersheds containing perennial streams and ground water systems. The general area <br />is of sufficient size to allow assessments of cumulative hydrologic impacts in the basin. <br />A strict application of these definitions to Twentymile Park results in the areas shown on Map 4, Proposed <br />Hydrologic Area Boundaries. The proposed permit area includes all lands to be disturbed by mining activities over <br />MR13 -267 2.04 -9.2 09/24/13 <br />