Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #4 <br />Third Quarter 2013 <br />09/24/13 <br />CDMR Rule 4.05.9(17) <br />General Description or Reference to Site Plan: <br />This sediment control pond lies west of the Development Waste Pile. The majority of <br />run-off from this waste pile flows to this pond. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: xcell Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some a None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No <br />At the principal spillway inlet? Yes No <br />4). Erosion of the downstream toe of the embankment? Yes No y <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No <br />Could this seepage cause potential instability? <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />Yes <br />Yes <br />Yes <br />r/ <br />4). Is erosion occurring at the discharge outlet? Yes <br />Evaluate the severity: Extensive Moderate Just starting None <br />No <br />No <br />No <br />No i/ <br />