Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Mine: New Elk <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />CDMR Rule 4.05.9(17) <br />RDA Containment North <br />None <br />Third Quarter 2013 <br />09/24/13 <br />General Description or Reference to Site Plan: <br />This incised containment basin is a non - discharging facility designed to contain run -off from the <br />RDA belt conveyor area north of highway 12. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent Moderate Few Poor <br />2). Erosion forming Gullies: Extensive Some ew None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No 1� <br />4). Erosion of the downstream toe of the embankment? Yes No (�- <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes No_� <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: <br />OTHER OBSERVATIONS: <br /><.A �M 1— t\111 A <br />MSHA Qualified Impoundme Inspector <br />I fA,5 <br />Date <br />