Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk WP Containment #2 <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />None <br />Third Quarter 2013 <br />09/24/13 <br />General Description or Reference to Site Plan: <br />This containment basin is a non - discharging facility designed to contain run -off from the <br />West Portal airshaft and manway areas. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />cellent Moderate Few Poor <br />Extensive Some Few None <br />4). Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />Yes No <br />Yes No y <br />Yes No <br />1). Has the design storage capacity of the reservoir been surpassed? t/ <br />Yes No <br />OTHER OBSERVATIONS: <br />MSHA Qualified Impoundmefft Inspector <br />Date <br />