Laserfiche WebLink
Table 1 <br />Four Corners Materials <br />Simmons Pit Operations: Water Depletion and Replacement Analysis <br />Month <br />Depletions From <br />Dust Supression <br />Evaporative <br />Depletions from <br />Stock Pond <br />Total Depletions <br />River <br />Administration <br />Potential <br />Out of Priority <br />Depletion <br />Historical Consumptive <br />Use Credits for 32 <br />Acres <br />Net Depletion after <br />Application of HCU <br />Credits <br />AF <br />AF <br />AF <br />1= es,2 =no <br />AF <br />AF <br />AF <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />January <br />0.00 <br />000 <br />000 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />February <br />000 <br />0.02 <br />002 <br />0 <br />000 <br />0.00 <br />0.00 <br />March <br />0.00 <br />0.07 <br />007 <br />0 <br />000 <br />0.00 <br />000 <br />April <br />010 <br />0.13 <br />023 <br />0 <br />000 <br />0.51 <br />000 <br />May <br />010 <br />0.20 <br />030 <br />0 <br />0.00 <br />5.69 <br />0.00 <br />June <br />010 <br />0.27 <br />037 <br />1 <br />037 <br />11.51 <br />0.00 <br />July <br />0.10 <br />025 <br />035 <br />1 <br />0.35 <br />7.64 <br />0.00 <br />August <br />0.10 <br />0.19 <br />029 <br />1 1 <br />0 29 <br />2.72 <br />0.00 <br />September <br />0 00 <br />0.16 <br />0.16 <br />2069 <br />1 <br />016 <br />2.70 <br />0.00 <br />October <br />0.00 <br />0.09 <br />0 <br />0.00 <br />084 <br />0.00 <br />November <br />0 00 <br />0.04 <br />004 <br />0 <br />0.00 <br />0.00 <br />0.00 <br />December <br />0.00 <br />0 00 <br />I 0.00 <br />1 0 <br />0 00 <br />0.00 <br />000 <br />Annual <br />1 0.51 <br />1 1.41 <br />1 1.92 <br />1 <br />1.17 <br />31.61 <br />1 0.00 <br />Notes <br />(1) Dust supression based on 10% conservative increase over measured dust suppression volume in 2012. <br />(2) Based on evaporation from Column (7) of Appendix A Net evaporation rate of 2.88 fUacre for a surface area of 0.49 acres. <br />(3) Equals Column 1 + Column 2 <br />(4) Potential months of river administration based on conversations with the water commissioner, 1 = River Administration and 0 = Free River <br />(5) Equals Column 3 x Column 4 <br />(6) Equals Column 3 from Table 2 Dry-up of 32 acres based on Simmons Pit Operations Area. <br />(7) Equals Column 6 - Column 5 if Column 5 is greater than Column 6. If Column 5 is less than Column 6, no out of priority depletions occur. <br />P \031 MMW- SmmWSWSP R.-I 2013 Red DO1\ Wn ht Water Engineers, Inc Des RKFi <br />S,mmo SWSP Tables 2013 9 9 Y <br />T1- Deplabw M.",. June 2013 Ckd by PRF <br />