Laserfiche WebLink
Section 2.05.3(4) <br />Ponds, Impoundments, Other Treatment facilities and Diversions <br />Table of Contents <br />Introduction 1 <br />Sediment and Water Control Facilities Plan 1 <br />Collection Ditches, Culverts and Diversion Design Parameters 2 <br />Designs for all Ditches in the Permit Area 4 <br />Sedimentation Pond 4 <br />Design Methodology 6 <br />Special Features 6 <br />Temporary Relocation for CC Company Second Park Lateral Ditch 6 <br />Design Details 7 <br />Timing 8 <br />LIST OF MAPS <br />Map 2.05.3(4) -1 Surface Water Hydrology <br />Map 2.05.3(4) -6 Pond NHN -001 As -Built <br />Map 2.05.3(4) -7 NHN -001 Ditches As -Built (Plan) <br />Map 2.05.3(4) -8 NHN -001 Ditches As -Built (Cross Sections) <br />LIST OF APPENDIX <br />Appendix 2.05.3(4) -1 <br />Arcadis Report on Sediment Control <br />Appendix 2.05.3(4) -2 <br />SECAD Design Report <br />Appendix 2.05.3(4) -2A <br />Arcadis Pond Slope Stability Analysis <br />Appendix 2.05.3(4) -3 <br />Water Discharge Permit <br />Appendix 2.05.3(4) -4 <br />Del -Mont Consultants' Pipeline Design Report for CC Ditch <br />Relocation Report <br />Appendix 2.05.3(4) -5 <br />CCC Ditch Relocation Alignment <br />Appendix 2.05.3(4) -6 <br />Pond NHN -001 As -Built <br />Appendix 2.05.3(4) -7 <br />NHN- 001 Ditches As -Built <br />August 2013 (TR 04) <br />0/' z?et 00 <br />