Laserfiche WebLink
7) A pressure regulator will be placed in the line near the exit to control flow in the <br />entire pipe. <br />Timing <br />1) Temporary pipe will be laid following the 2011 irrigation season and will be <br />operational for the 2012 season. <br />2) After mining continues north of the Garvey property and the area for the <br />permanent line has been backfilled and graded, the permanent line can be <br />installed and should be ready for the 2017 irrigation season. <br />Section 2.05.3(4) Page 8 November 2011 <br />