Laserfiche WebLink
-3- <br />6. Does the prospector wish this report to be considered confidential? <br />(See Rule 2.02.7(2)). No If yes, attach a justification for the request. <br />.7. Additional Comments: <br />Final sealing and surface plugging of the drill hole occurred on <br />11 -22 -89 and the mud pits were temporarily fenced to dry. <br />On 9 -25 -91 the mud pits and drill site were graded to approximate <br />original contour and seeded with the CMLRD approved seed mix. All <br />temporary fencing was removed from the site. <br />Elevation of the reclaimed drill site is 6,155'. <br />I, the undersigned, hereby certify that the exploration activities for which I <br />posted bond are completed, and that, to the best of my knowledge, all <br />applicable reclamation requirementrs have been met. <br />By: <br />Title: Consulting Geologist <br />Authorized Operator <br />Representative ` <br />The foregoing instrument was acknowledged before me this <br />May 1992 Glenn E. Miller <br />,b y <br />day of <br />as <br />Authorized Representative of Energy Fuels Coal, Inc. <br />, Operator. <br />Notary Public <br />My Commission Expires: <br />(Rev. 5/88) <br />Doc. No. 2949F <br />