My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-24_REVISION - M1985112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985112
>
2013-10-24_REVISION - M1985112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:30 PM
Creation date
10/24/2013 4:16:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985112
IBM Index Class Name
REVISION
Doc Date
10/24/2013
Doc Name
TR01 Responses to Second Adequacy review Comments (See separate map)
From
J & T Consulting, Inc
To
DRMS
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J &T Consulting, Inc. Loloff Construction <br />VReclam,titBond Loloff Pit <br />10/22/2013 <br />Quantities and Costs tpy <br />K2013 J&T Cowultim, lnc. 13137 Loloff Rec Bond Calcs TR1 <br />Summary of Unit Costs <br />Direct costs <br />Dewatering full pit <br />Phass 1 (Current Partially Mined Condition) <br />350 / million gallons <br />lKeciamation uperation Quantity - Unit m os cost <br />Active Mining Area <br />Dewatering of Full Pit for Current Partially Mined Condition 104.3 Mil. Gal. $350 $36,505 <br />Total Direct Cost $36,505 <br />Overhead and Profit Cost (12.60 %) $4,600 <br />ontract Cost $41,105 <br />Project Management (9.25 %) $3,377 <br />Financial Warranty Required For Phase 1 <br />Phase 2 (Fully Mined Out Condition) <br />1111eciamation uperation Quantity Unit Unit Costos <br />Active Mining Area <br />Credit for Phase 1 Dewatering of Full Pit for Partially Mined Condition 1 LS ($44,481) ($44,481) <br />Dewatering of Full Pit for Fully Mined Out Condition 422 Mil. Gal. $350 $147,735 <br />Total Direct Cost $103,254 <br />Overhead and Profit Cost (12.60 %) $13,010 <br />Contract Cost $116,264 <br />Project Management (9.25 %) $9,551 <br />Additional Financial Warranty Required For Phase 2 $125,815 <br />1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.