Laserfiche WebLink
112c Annual Report <br />Page 2 of 3 <br />0 <br />Permittee Name: <br />APC Southern Construction <br />Co., LLC <br />Permit Number: <br />M- 2000 -118 <br />Operation Name: <br />Pino Pit <br />County: <br />Huerfano <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />November 15, 2013 <br />Permit Acreage: <br />80.00 <br />Current Bond Amt: <br />$115,400.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <YD NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? Ac7 —,aF— /D-1e)—a0'3 <br />5. Does the mine operate more than 180 days per year? <br />If "NO", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report y1s.r e C IVE D <br />9. Number of acres that were reclaimed during the current report year. <br />�Vl 23 2013 <br />10. Estimated new acreage to be affected in the next report year. MASION OF RECLAMATION <br />MINING AND SAFETY <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />YES NO <br />YES <br />YES NO <br />30 <br />T B.D <br />T 8• D <br />Total acres <br />backfilled: <br />77 &�- <br />Total acres <br />seeded w/ <br />7, $ D' <br />Total acres <br />w /topsoil <br />7� B. D. <br />Total acres <br />mulched w/ <br />dloNE <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />1 <br />Mulch application, <br />graded: <br />%VonlE <br />fertilized w/ <br />�JoAIE <br />replacement <br />OA)C <br />rate (tons/ac): <br />�N <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />7b R;tt_ <br />Fertilizer <br />- r; <br />Mulch <br />��r GLA fA7'iflA, <br />application <br />63eo,4Dr_ AST <br />application <br />?4'`"' <br />application <br />�L,4�, <br />method: <br />method: <br />method: <br />