Laserfiche WebLink
� 1 r <br />Laurine Koellner <br />L &L Ready Mix <br />PO Box 218 <br />Haxtun, CO 80731 -0218 <br />October 18, 2013 <br />Division of Reclamation, Mining & Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: M- 1998 -059 <br />Sunny Dale Farm Pit <br />Annual Report <br />M � <br />RECEIVED <br />OCT 2 3 2013 <br />L3, ,4jsion of Reclamation, <br />Mkning & Satety <br />The reclamation process is almost completed. All banks are sloped to requirements and most of the top <br />soil has been replaced. We have a small area that we need to apply the topsoil and will be reseeding <br />this November or December, 2013, weather permitting, as indicated in our reclamation plan. <br />When the proper vegetation is well established, we will be ready for final inspection and closing out the <br />Sunny Dale Farm Pit. <br />Enclosed is check #13553 in the amount of $791.00 for the annual fee. <br />Respectfully, <br />Laurine Koellner <br />Enclosure <br />