My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-10-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:20 PM
Creation date
10/23/2013 8:52:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/21/2013
Doc Name
Weekly CQA Reports- 9/21/13 and 9/28/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br />• <br />� <br />11 Am <br />_ <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * * *. * * ** 09.21.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 09.15.13 thru 09.21.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />w <br />D <br />D <br />D <br />D <br />D <br />- <br />w <br />N <br />N <br />N <br />N <br />N <br />D = Day Shift N = Night Shift <br />w = Weather Day <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting ep riod: <br />Low: 337 — 43 °F Cloud Cover: Partly Cloudy / Cloudy <br />High: 47 °F — 66 °F Precipitation: showers <br />Wind: Calm to Gusts at times <br />Ames: Construction activities were limited on Monday (9.16.13) due to weather conditions. <br />Planning: Continuing Construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (Phase I) <br />Topsoil / Overburden Stripping: During this reporting period, topsoil materials were observed being stockpiled <br />and hauled to area 34 stockpile from West of the Bali Mill Embankment toe, South of the Crib Wall. <br />Production drilling: No production drilling occurred during this reporting period. <br />One production blast occurred during this reporting period within planned VLF limits. <br />Structural Fill: The contractor continued fill operations and compaction by method specification for the ADR haul <br />road and the PSSA toe berm. <br />Structural fill materials were placed and compacted for the ADR haul road. A Cat D8T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat 563 smooth drum roller by method specification. <br />Structural fill materials were placed and compacted within the PSSA toe -berm. Excess materials were used as fill <br />and placed in 24 inch lifts and compacted by method specification utilizing a Cat CS56B Smooth Drum roller. It <br />should be noted; fill placed for the PSSA Toe berm, was keyed into the existing HWY embankment as fill lifts were <br />brought up. Progress is expected to continue. <br />See Hwy 67 embankment fill below for additional detail on materials placed. <br />Page I of 6 MLE2 WE 09.21.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.