Laserfiche WebLink
Table 2 <br />Ready Mixed Concrete Company - Bromley Lakes Site and North Tower Pit <br />Kenneth Mitchell Lake /Erger's Pond Storage Balance <br />Proposed SWSP Operations <br />(all values in acre -feet) <br />Notes: <br />[1] Total surplus Fulton HCU delivered to storage is equal to the Fulton Ditch delivery to storage (as reported by <br />RMCC and or Brighton). <br />[2] Required releases from storage to the river for augmentation of all pits. Equal to the previous month's <br />remaining operations replacement requirement (Table IC, Col [3 1]) plus the required augmentation <br />deliveries to the river ( "fable IC, Col [261). <br />[3] Actual total release of RMCC water from storage to the river or to Brighton in exchange for other <br />augmentation deliveries made by Brighton. <br />[4] RMCC's portion ofstorage evaporation, estimated based upon storage projections. <br />[5] RMCC's storage in Brighton's Kenneth Mitchell Lake I, Erger's Pond, and /or 124th Storage Pond. Equal to <br />previous [5] [1] - [3] - [4]. <br />B BA <br />11 ti rr n r- a u n c n t ,v A% s n c- i .i ! l s i ,v c 9/19/2013 2 02 Pas JAK <br />Total Surplus <br />Storage Release to River or <br />RMCC's <br />RMCC's <br />Fulton HCU <br />Exchange w Brighton <br />Portion of <br />EOM <br />Required Actual <br />Delivered <br />Storage <br />Storage <br />To Storage <br />Release Release <br />Evaporation <br />Month <br />III <br />r2l 3 <br />4 <br />5 <br />Nov <br />0 <br />0 0 <br />0 <br />0 <br />Dec 2013 <br />0 <br />0 0 <br />0 <br />0 <br />Jan 2014 <br />0 <br />0 0 <br />0 <br />0 <br />Feb <br />0 <br />0 0 <br />0 <br />0 <br />Mar <br />0 <br />0 0 <br />0 <br />0 <br />Apr <br />0 <br />0 0 <br />0 <br />0 <br />May <br />0 <br />0 0 <br />0 <br />0 <br />Jun <br />4.5 <br />0 0 <br />0 <br />4.5 <br />Jul <br />13.7 <br />0 0 <br />0.2 <br />18.0 <br />Aug <br />8.9 <br />0 0 <br />0.6 <br />26.3 <br />Sep <br />0 <br />5.4 5.4 <br />0.8 <br />20.1 <br />Oct <br />0 <br />15.1 15.1 <br />0.5 <br />4.5 <br />Nov <br />0 <br />4.5 4.5 <br />0.1 <br />0 <br />Dec 2014 <br />0 <br />0 0 <br />0 <br />0 <br />Jan 2015 <br />0 <br />0 0 <br />0 <br />0 <br />Feb <br />0 <br />0 0 <br />0 <br />0 <br />Mar <br />0 <br />0 0 <br />0 <br />0 <br />Apr <br />0 <br />0 0 <br />0 <br />0 <br />May <br />4.5 <br />0 0 <br />0 <br />4.5 <br />Jun <br />11.1 <br />0 0 <br />0.1 <br />15.5 <br />Jul <br />16.8 <br />0 0 <br />0.6 <br />31.7 <br />Aug <br />8.8 <br />0 0 <br />1.1 <br />39.5 <br />Sep <br />0 <br />5.6 5.6 <br />1.2 <br />32.6 <br />Oct <br />0 <br />15.2 15.2 <br />0.8 <br />16.6 <br />Nov <br />0 <br />16.6 16.6 <br />0.3 <br />0 <br />Dec 2045 <br />0 <br />0 0 <br />0 <br />0 <br />Nov 13-Jul 14 Total <br />18.2 <br />0 0 <br />0.2 <br />- <br />2014 -2015 Total <br />41.4 <br />25.0 25.0 <br />2.8 <br />- <br />Auv -Dec 2015 Total <br />8.8 <br />37.4 37.4 <br />3.4 <br />Notes: <br />[1] Total surplus Fulton HCU delivered to storage is equal to the Fulton Ditch delivery to storage (as reported by <br />RMCC and or Brighton). <br />[2] Required releases from storage to the river for augmentation of all pits. Equal to the previous month's <br />remaining operations replacement requirement (Table IC, Col [3 1]) plus the required augmentation <br />deliveries to the river ( "fable IC, Col [261). <br />[3] Actual total release of RMCC water from storage to the river or to Brighton in exchange for other <br />augmentation deliveries made by Brighton. <br />[4] RMCC's portion ofstorage evaporation, estimated based upon storage projections. <br />[5] RMCC's storage in Brighton's Kenneth Mitchell Lake I, Erger's Pond, and /or 124th Storage Pond. Equal to <br />previous [5] [1] - [3] - [4]. <br />B BA <br />11 ti rr n r- a u n c n t ,v A% s n c- i .i ! l s i ,v c 9/19/2013 2 02 Pas JAK <br />