My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_HYDROLOGY - M1977436
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977436
>
2013-10-22_HYDROLOGY - M1977436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:24 PM
Creation date
10/23/2013 8:46:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
HYDROLOGY
Doc Date
10/22/2013
Doc Name
SWSP
From
OSE
To
Bishop-Brogden Associates, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Ready Mixed Concrete Company - Bromley Lakes Site and North Tower Pit <br />Kenneth Mitchell Lake /Erger's Pond Storage Balance <br />Proposed SWSP Operations <br />(all values in acre -feet) <br />Notes: <br />[1] Total surplus Fulton 1ICU delivered to storage is equal to the Fulton Ditch delivery to storage (as reported by <br />RMCC and or Brighton). <br />[2] Required releases from storage to the river for augmentation of all pits. Equal to the previous month's <br />remaining operations replacement requirement (Table 1C, Col [3 1]) plus the required augmentation <br />deliveries to the river (Table 1 C, Col [261). <br />[3] Actual total release of RMCC water from storage to the river or to Brighton in exchange for other <br />augmentation deliveries made by Brighton. <br />[4] RMCC's portion of storage evaporation, estimated based upon storage projections. <br />[5] RMCC's storage in Brighton's Kenneth Mitchell Lake I, Erger's Pond, and /or 124th Storage Pond. Equal to <br />previous [5] + [1] - [3] - [4]. <br />BBA <br />g N 1 1 It r) P 11 R 0 G D t N A S 5 0 C! .1 1 1 5 1 N C 9/1912013 2 02 PAS JAI, <br />Total Surplus <br />Storage Release to River or <br />RMCC's <br />RMCC's <br />Fulton HCU <br />Exchange w Brighton <br />Portion of <br />EOM <br />Delivered <br />Required Actual <br />Storage <br />Storage <br />To Storage <br />Release Release <br />Evaporation <br />Month <br />I <br />2 1 [31 <br />1 4 <br />5 <br />Nov <br />0 <br />0 0 <br />0 <br />0 <br />Dec 2013 <br />0 <br />0 0 <br />0 <br />0 <br />Jan 2014 <br />0 <br />0 0 <br />0 <br />0 <br />Feb <br />0 <br />0 0 <br />0 <br />0 <br />Mar <br />0 <br />0 0 <br />0 <br />0 <br />Apr <br />0 <br />0 0 <br />0 <br />0 <br />May <br />0 <br />0 0 <br />0 <br />0 <br />Jun <br />4.5 <br />0 0 <br />0 <br />4.5 <br />Jul <br />13.7 <br />0 0 <br />0.2 <br />18.0 <br />Aug <br />8.9 <br />0 0 <br />0.6 <br />26.3 <br />Sep <br />0 <br />5.4 5.4 <br />0.8 <br />20.1 <br />Oct <br />0 <br />15.1 15.1 <br />0.5 <br />4.5 <br />Nov <br />0 <br />4.5 4.5 <br />0.1 <br />0 <br />Dec 2014 <br />0 <br />0 0 <br />0 <br />0 <br />Jan 2015 <br />0 <br />0 0 <br />0 <br />0 <br />Feb <br />0 <br />0 0 <br />0 <br />0 <br />Mar <br />0 <br />0 0 <br />0 <br />0 <br />Apr <br />0 <br />0 0 <br />0 <br />0 <br />May <br />4.5 <br />0 0 <br />0 <br />4.5 <br />Jun <br />11.1 <br />0 0 <br />0.1 <br />15.5 <br />Jul <br />16.8 <br />0 0 <br />0.6 <br />31.7 <br />Aug <br />8.8 <br />0 0 <br />1.1 <br />39.5 <br />Sep <br />0 <br />5.6 5.6 <br />1.2 <br />32.6 <br />Oct <br />0 <br />15.2 15.2 <br />0.8 <br />16.6 <br />Nov <br />0 <br />16.6 16.6 <br />0.3 <br />0 <br />Dec 2015 <br />0 <br />0 0 <br />0 <br />0 <br />Nov 13 -Jul14 Total <br />18.2 <br />0 0 <br />0.2 <br />- <br />2014 -2015 Total <br />41.4 <br />25.0 25.0 <br />2.8 <br />- <br />Aug -Dec 2015 Total <br />8.8 <br />37.4 37A <br />3.4 <br />- <br />Notes: <br />[1] Total surplus Fulton 1ICU delivered to storage is equal to the Fulton Ditch delivery to storage (as reported by <br />RMCC and or Brighton). <br />[2] Required releases from storage to the river for augmentation of all pits. Equal to the previous month's <br />remaining operations replacement requirement (Table 1C, Col [3 1]) plus the required augmentation <br />deliveries to the river (Table 1 C, Col [261). <br />[3] Actual total release of RMCC water from storage to the river or to Brighton in exchange for other <br />augmentation deliveries made by Brighton. <br />[4] RMCC's portion of storage evaporation, estimated based upon storage projections. <br />[5] RMCC's storage in Brighton's Kenneth Mitchell Lake I, Erger's Pond, and /or 124th Storage Pond. Equal to <br />previous [5] + [1] - [3] - [4]. <br />BBA <br />g N 1 1 It r) P 11 R 0 G D t N A S 5 0 C! .1 1 1 5 1 N C 9/1912013 2 02 PAS JAI, <br />
The URL can be used to link to this page
Your browser does not support the video tag.