Laserfiche WebLink
Collection #1 Initial <br />See Map C -3 for ditch path <br />See Map G -1 B for ditch path <br />Legend <br />10700 <br />10700 Grades <br />Collection #5 <br />Segment 1 <br />Segment 2 Segment 2 (rec) <br />Ditch grade <br />Segment 1: 17.2% <br />SWB -8 <br />egment 1 <br />10650 <br />SWB -6 Initial <br />- Segment 3 <br />segment 2 <br />- segment a <br />Segment 2: 0.5% <br />° <br />10650 Segment 3: 7.5% <br />Segment 4: 0.5% <br />10700 2.41 cfs <br />10700 <br />0.50ft. Freeboard <br />0.75! I O.zS ft. i <br />1.0 ft. F aboard <br />Segment 1 <br />�- <br />` 2.00 ft. - -'- 1,00ft. Freeboard <br />5.61 cfs <br />10600 <br />10600 <br />10650 <br />Grades <br />10650 <br />Triangular Channel <br />9 <br />� / o. ft. Trapezoidal Channel <br />0 0 0 <br />o to o <br />0 0 0 0 0 0 0 0 <br />to 0 rn o to o to o <br />0 o O O o 0 0 0 <br />to o V) o to o In 0 <br />0 0 o <br />to o to <br />Segment 1: 2.2% <br />o <br />Segment 2 <br />Equal Side Slopes <br />Channel Lining: Pre mine waste rock <br />Equal Side Slopes <br />Channel Lining: Grouted riprap <br />Collection A <br />0 0 <br />.+- N N M M It v � <br />0 0 0 1` o 0 rn <br />M o 0 <br />10600 Segment 2: 84% <br />10600 <br />O O O O O O <br />to O to O to O <br />O O 0 0 O O O <br />to O to O to O to <br />36" CMP (half) <br />SWB -6A Collection ditch A will be installed at a 1.0% <br />N N M <br />M d v to 0 0 0 <br />4.36 CFS slope down it's entire course. <br />Segment 1 <br />Segment 2 <br />Segment <br />Segment <br />Segment 1 <br />� °� _ � 050a Freeboard <br />- - -- <br />Min. toner. depth = 1.0 ft.� - _ <br />10 T <br />Diversion #1 Initial <br />See Map C -3 for ditch path <br />�� �I - �O.SOft. Freeboard r0.50ft. Freeboard �,50ft. Freeboard <br />1.0 ft.Feeboard 2.50 T 1 - -5ft -�J °ft <br />.356 �- <br />T- <br />2.50 2.50 - - <br />Triangular Channel <br />Triangular Channel <br />Triangular Channel <br />Triangular Channel <br />Unequal Side Slopes <br />Channel Lining: Compacted tailings (n= 0.020 - 0.025) <br />Flow Capacity <br />Equal Side Slopes <br />Equal Side Slopes <br />Equal Side Slopes <br />Grades <br />SWB- 1lnitial <br />Vt Capacity fps <br />i e <br />Channel Lining: Pre mine waste rock <br />Channel Lining: Pre mine waste rock <br />Channel Lining: Pre mine waste rock <br />10700 Segment 1: 2.0% <br />40.51 cfs <br />10700 <br />36" CMP (half) <br />- <br />_.. - egment 1 _ __...._ <br />10650 <br />-� 10650 <br />Collection B <br />0 o O O 0 0 <br />0 to 0 to o to <br />0 0 0 0 0 0 0 0 <br />0 rrg 0 to O to to 0 <br />0 0 0 0 <br />0 to O to <br />+ + + + + + <br />0 O r r N N <br />+ + + + + + + + <br />co co a It to un to W <br />+ + + + <br />I` ti 0 Co <br />SWB -6B Collection ditch B will be installed at a 1.0% <br />6.40 CFS slope down it's entire course. <br />-._, 0.50ft. Freeboard <br />; � -r <br />bd.. p <br />Segment 1 <br />�_ 050 ft. Freeboard <br />-- �t ,° T <br />Collection #1 Final See Map G -1 B for ditch path <br />15 ft <br />1 <br />1 <br />Min.const.depth= ,.25ft�i <br />3 <br />3 <br />3 <br />4.° ft.� <br />Triangular Channel <br />Unequal Side Slopes <br />10750 <br />10750 <br />Trapezoidal Channel <br />; = <br />Riprap distribution: Filter distribution: Base distribution: Riprap gradation determined <br />Channel Lining: Compacted tailings (n= 0.020 - 0.025) <br />Flow capacity =- 10.50cfa <br />Velocity Capacity 2.87 fps <br />Equal Side Slopes <br />eopoeo <br />D,Da = 2.0 ft. rock Diw = 12 in. rock <br />D <br />D. = 1.7 ft. rock D. = 10 in. rock <br />D,. = 4 in. rock using CSU methodology <br />9 9Y <br />D. = 3.4 in. rock <br />10700 egment, <br />10700 <br />Channel Lining: 12 inch (D.) Rock Rip -Rap <br />° <br />3> <br />D = <br />m 1.0 ft. rock D. = 6 in. rock <br />(Simons and Senturk) <br />= <br />D. 2 in. rock <br />_ <br />See the CSU Procedure Designs in Appendix <br />6 for more information <br />' ^'`a <br />°save, <br />D,s = 0.42 ft. rock D,s = 2.5 in, rock <br />D,, = 0.8 in. rock <br />10650 Grades <br />Segment 2 Segment 3 <br />-__ <br />-- -- - -- Segment 4 <br />10650 <br />s <br />Da = 0.1 ft. rock Do = 0.6 in, rock <br />Do = 0.2 In. rock <br />Segment 1: 28.6% <br />Segment 2 &3: 0.5% SWB <br />-6A + SWB -6C SWB -6A + SWB -6C + SWB -6D <br />I <br />Segment 4: 7.5% 4.36 + 2.06 = 6.42 CFS 4.36 + 2.06 + 3.59 = 10.01 CFS <br />-- J <br />10600 <br />10600 <br />0 0 0 0 <br />0 to <br />+ + + + <br />O O r r <br />0 0 0 0 0 0 0 O <br />04 N M M V V LO LO <br />+ + + + + + + + <br />N N M M er � 1n to <br />o 0 0 0 0 0 0 0 <br />to 0 � o to 0) to <br />+ + + + + + + + <br />O (D � � W Co O O <br />0 0 0 0 <br />0 CD <br />+ + + + <br />O O r r <br />See Map G -1 B for ditch path <br />Typical Grouted Channel <br />r r r r <br />Diversion #1 Final <br />(longintudinalview) <br />Segment 1 <br />Segment 1 (rec) Segment 2 Segment 3 <br />Segment 4 <br />10850 <br />,oaSQ <br />4 in. HDPE drain pipes; located every 30 ft. along channel <br />1. <br />.25 ft. <br />1 1�� t. Freeboard _ 1.25 ft�° Freeboard __O. <br />1. . Freeboard <br />OOft reeboard <br />50111. Freeboard 1 1 .0 75 ft. <br />10800 ? ~ �1 <br />0800 <br />1.75ft. Freeboard <br />0.50 ft. <br />L <br />Grou <br />lFeeboard <br />2 bO ft 25U � z5u <br />Trapezoidal Channel <br />/ i <br />156 <br />� <br />tiNJ�' -'V <br />3.50 ft. <br />nted channel <br />Equal Side Slopes <br />10750 <br />32.fi cfs <br />10750 <br />Trapezoidal Channel <br />Pertorated end <br />Channel Lining: Grouted riprap Triangular Channel <br />Triangular Channel <br />Triangular Channel <br />Equal Side Slopes <br />Equal Side Slopes <br />Channel Lining: Grouted riprap <br />36" CMP (half) <br />Equal Side Slopes Equal Side Slopes Channel Lining: Pre mine waste rock <br />Channel Lining: Pre mine waste rock Channel Lining: Pre mine waste rock <br />10700 <br />$egmenl1 <br />10700 <br />6 inches of pipe into the underlying <br />Grades <br />ground; 3 inches protruding from <br />10650 Segment 1: 27.2% <br />10650 <br />channel bottom <br />10600 <br />10550 <br />�1 10600 <br />10550 <br />See Map C -3 for ditch path <br />Collection #2 Initial <br />Grades <br />10700 <br />Segment 1: 2.0% SWB -6 Initial <br />10700 <br />10500 <br />00 00 00 00 <br />00 00 <br />10500 <br />0o 0o <br />5.61 cfs <br />ton ton ton <br />ton too 00 too ton <br />t0n ttoo <br />O O r r N N M <br />M V 7 to to to (O <br />I` 1`1 to 00 <br />10650 <br />10650 <br />0 0 0 <br />0 to o <br />0 0 0 0 0 0 0 0 <br />to O to 0 to 0 to O <br />0 0 0 0 0 <br />to 0 to O to <br />+ + + <br />O O r <br />+ + + + + + + + <br />r N N M M le v N <br />+ + + + + <br />to W W � P_ <br />Diversion #1 B Final <br />p See Ma G -1 B for ditch path <br />Segment 1 <br />Segment 2 <br />Segment 3 <br />"" . t � 1.00ft. Freeboard <br />1.00 t[ <br />F 1.00ft. Freeboard <br />Cott. 1. <br />_ 11-'-0' 5 ft Freeboard <br />1 <br />10850 <br />10850 <br />10850 <br />1 -�_' 1 -� <br />1. ft. F o <br />eb and <br />� <br />s 5 -� T <br />; , , <br />Triangular Channel <br />0. ft. <br />- <br />Triangular Channel <br />Triangular Channel <br />10800 segment 1 <br />10800 <br />Equal Side Slopes <br />Equal Side Slopes <br />Channel Lining: Native site material <br />48" CMP (half) <br />Channel Lining: Native site material <br />g <br />Channel Lining: Pre mine waste rock <br />10750 Grades <br />10750 <br />Segment 1:5.0% Segment <br />Segment 3_ ____- <br />Segment <br />Segment 2 (rec) <br />d <br />10700 Segment 2: 45% <br />10700 <br />Segment 3: 5.0% <br />r 1.251t. Freeboard <br />1 <br />0.25 ft. <br />1 / 1 <br />10650 <br />10650 <br />4.00 ft. <br />0 0 0 0 0 0 O <br />O to O to O to o <br />0 0 0 0 0 0 <br />to 0 to 0 to O <br />Trapezoidal Channel <br />0 0 ++- N N M <br />M v v 0 U (+o <br />Equal Side Slopes <br />Channel Lining: Grouted riprap <br />Segment 1 <br />Segment <br />See Map G -1 B for ditch path <br />See Map G -1 B for ditch path <br />Collection #2 Final <br />2 <br />Diversion #2 <br />Segment 1 <br />r1.00ft. Freeboard <br />10.50ft. Freeboard <br />ft <br />1.5 ft. board 1J =5' -1' <br />T <br />10750 <br />10750 b� 1.75ft. <br />T <br />\ <br />0 -r- <br />o• ft. <br />Triangular Channel <br />g <br />Equal Side Slopes <br />10700 - <br />- Segment 1- __ -- _ <br />Triangular Channel <br />- 10700 Equal Side Slopes <br />Channel Lining: <br />10750 SWB -6B +SWB -6E <br />Grades 10750 <br />Channel Lining: Pre mine waste rock <br />Grades <br />_ Native site <br />material <br />6.40 + 1.62 = 8.02 cfs <br />Segment 1: 30.3% <br />48" CMP (half) <br />10650 Segment 1: 1.0% <br />10650 <br />�� <br />10700 Segment, <br />Segment 2: 7.7% <br />10700 <br />Segment 1 (rec) <br />0 0 0 0 0 0 <br />C) to o to o to <br />+ + + + + + <br />0 0 0 0 0 0 <br />o to o to o to <br />+ + + + + + <br />O 0 <br />o to <br />+ <br />+ + <br />O O r N N <br />M M 'y In O <br />O <br />10650 <br />segment 10650 <br />O O O O <br />0 L0 a <br />O O <br />0 Lo <br />Freeboard <br />O O <br />N N <br />1 10•50�1.25ft. <br />2.00 ft. I T <br />Trapezoidal Channel <br />Equal Side Slopes <br />Channel Lining: Grouted riprap <br />Collection #3 <br />See Map G -1 B for ditch path <br />See Map G -1 B for ditch path <br />10750 <br />10750 <br />Diversion #3 <br />Diversion #3B <br />SWB -7A +SWB -7B +SWB -7C <br />SWB -7A <br />2.17 + 2.60 + 4.15 = 8.92 cfs <br />10700 2.17 cfs <br />�-- <br />10700 <br />10750 <br />Grades <br />Connection of HDPE drain pipe 10750 <br />segment 1 <br />Sement 1:1.2 ° (3 ' <br />10650 <br />- -- <br />segment <br />10650 <br />10700 Segment 2: 5.0% ' " <br />10700 <br />1 0700 <br />-.,---Segment 2 - -��I <br />- - Segment <br />Grades <br />- egmentl-- - -. -_- <br />Grades <br />�__� <br />_ <br />-`- - _ - - -� <br />10600 o <br />Segment 1:15.5 /o <br />SWB-7A + SWB-7B <br />10600 <br />10650 <br />10650 <br />Segment 1: 4.5% <br />Segment 2: 2.0% <br />2.17 + 2.60 = 4.77 cfs <br />0o ton 00 ton 00 ton 00 ton <br />0o t0n 00 too CD ton 00 <br />ton 00 too 00 <br />Segment 3:6.1% <br />+ + + + + + + + <br />0 0 N N M M <br />+ + + + + + + <br />It V to to W t0 Ill- <br />+ + + + <br />h 00 00 M <br />10650 <br />10550 <br />10550 <br />O o 0 0 <br />O to 0 to <br />0 0 0 0 0 O 0 0 0 <br />0 to O to O to 0 to o <br />O o 0 O O o <br />to 0 to O to 0 <br />O O r r <br />N N M M cl' � to to O <br />tD n 1-- W rip O <br />0 LO <br />Segment 1 <br />Segment 2 <br />Segment 3 <br />Segment 1 <br />Segment 2 <br />0 0 <br />0.50 t� 1.00ft. Freeboard <br />``�� <br />1 / 1 -r, 75T 0.50ft. Freeboard <br />0.50ft. Freeboard <br />_ _ ! �5T <br />1j 11 <br />1 F.�6��� -236 T <br />4�\ 2.0 ft. <br />' <br />1.0 <br />eeboard <br />II <br />((� It.. FY <br />v++ l <br />_ I <br />11� <br />'' S6 T <br />. f <br />Triangular Channel <br />I� <br />Triangular Channel <br />eeboard <br />� <br />\ j 1� <br />ft <br />O.SOft. Freeboard <br />b <br />�/ o' ft. <br />„` I <br />0.50 <br />OC m tr 200 <br />V U U <br />Triangular Channel <br />Equal Side Slopes <br />Equal Side Slopes <br />t ,L <br />Equal Side Slopes <br />Channel Lining: Pre mine waste rock <br />Channel Lining: Pre mine waste rock <br />Channel Lining: Pre mine waste rock <br />60" CMP (half) <br />r, <br />60" (half) <br />DURANGO <br />LSAFEFIY <br />DIVISION OF RECLAMATION, <br />Triangular Channel <br />IN AND <br />Equal Side Slopes <br />Channel Lining: Native site material <br />See Map G -1 B for ditch path <br />Segment 1 (rec) <br />Segment 2 (rec) <br />Collection #4 <br />Segment 1 <br />SCANNED <br />10700 <br />4.79 cfs <br />1 0700 <br />0.50ft. Freeboard <br />z5 r0.50ft. Freeboard <br />� <br />ft-I <br />11� <br />� <br />11' <br />75ft. Freeboard <br />OO ft. <br />r ,ut <br />y';<' � a <br />0 <br />`1250 <br />755 <br />1� <br />5 �- °u <br />1.50 1.50 <br />sa w{ o • yi r <br />10650 segment1 <br />10650 �� <br />- <br />4.00ft.- <br />-{ I <br />400 ft. <br />d <br />Grades <br />Triangular Channel <br />Trapezoidal Channel <br />Trapezoidal Channel <br />a <br />gC' 20'36 C j,j <br />Segment 1:1.5% <br />10600 <br />10600 Equal Side Slopes <br />Equal Side Slopes <br />Equal Side Slopes <br />°o 0on <br />00 0 Channel Lining: Pre <br />mine waste rock <br />Channel Lining: Grouted riprap <br />Channel Lining: Grouted riprap <br />` ^ra, <br />ton o t <br />+ + + + <br />O O r r <br />too 0 <br />+ + + <br />N N M <br />W13 <br />l 'L - c 3 <br />. <br />Z- <br />NOTES: Ditch locations can be seen <br />on Maps C -1, C -2, C -3, G -1, and G -1 B. Figures <br />G -4 and G -4 show culvert and ditch lining standards <br />for the Revenue Mine. Table 6 -1 contains all of the hydraulic <br />calculations for the channel linings shown on the <br />ditch segments <br />REVISIONS <br />BY <br />DATE <br />DES: BL <br />on this map. <br />DATE <br />09/25/2013 <br />, <br />Greg <br />Map G -5: Ditch Designs <br />TR -01 Facility Changes, Revise Mine WaterDrainalgePlan <br />GL <br />9/25/13 <br />DRN:BL <br />Lewicki And Associates <br />Revenue Mine <br />CHK:GL <br />APPD: GL <br />SCALE <br />11541 Warrington Court Phone (303)- 346 -5196 <br />Parker, CO USA 80138 <br />Star Mine Operations <br />AS SHOWN <br />E -Mail - info @lewicki.biz <br />