Laserfiche WebLink
5ubmt+4 -ed by <br />po �3 U Page 2 of 3 <br />112c Annual Report <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESi <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />'�I1f "NO ", please review Rule 1.13 to assure that your /mine is in compliance. <br />v C� Q­ � .{ CG-J t.� fi J w� -ru ✓ I -e 5 ,2., L ; v' N u V c> L I /v1 - Ki , w%°i 1-1.2 T 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. jf�Ecc-a VZO <br />9. Number of acres that were reclaimed during the current report year. OCT 22 <br />2013 <br />10. Estimated new acreage to be affected in the next report ear. <br />g P Y Divi$fon of <br />11. Estimated acres to be reclaimed in the next report year. 111*1 ,& <br />Ct.�v- ✓'Pw 1 <br />OE <br />YES <br />YES <br />sc> <br />NO <br />(f <br />Total acres <br />Permittee Name: <br />The Cif of Lafayette <br />Permit Number: <br />2010 -071 <br />Operation Name: <br />Goose Haven Reservoir #2- Complex <br />County: <br />_M- <br />Boulder <br />w /topsoil <br />Expansion <br />mulched w/ <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />October 18, 2013 <br />Permit Acreage: <br />232.00 <br />Current Bond Amt: <br />$0.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESi <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />'�I1f "NO ", please review Rule 1.13 to assure that your /mine is in compliance. <br />v C� Q­ � .{ CG-J t.� fi J w� -ru ✓ I -e 5 ,2., L ; v' N u V c> L I /v1 - Ki , w%°i 1-1.2 T 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. jf�Ecc-a VZO <br />9. Number of acres that were reclaimed during the current report year. OCT 22 <br />2013 <br />10. Estimated new acreage to be affected in the next report ear. <br />g P Y Divi$fon of <br />11. Estimated acres to be reclaimed in the next report year. 111*1 ,& <br />Ct.�v- ✓'Pw 1 <br />OE <br />YES <br />YES <br />sc> <br />NO <br />(f <br />Total acres <br />e� <br />Total acres <br />%U <br />M(j, �,- i'r y a; SiTC T- h1_ Cf,­I 'A5 ,�- z�j. °•' ✓,, :. s <br />12. Total acres in various stages of reclamation, since permitted mining activities began: J , T <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch - <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />Ilk, <br />