<br />112c Annual Report
<br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit
<br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required
<br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is
<br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the
<br />dates for the beginning of active operations, and the date active operations ceased for the year.
<br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance
<br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the
<br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action.
<br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO
<br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO
<br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESi
<br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3.
<br />4. What was the date of last excavation, processing or hauling activity at the mine?
<br />5. Does the mine operate more than 180 days per year
<br />'�I1f "NO ", please review Rule 1.13 to assure that your /mine is in compliance.
<br />v C� Q � .{ CG-J t.� fi J w� -ru ✓ I -e 5 ,2., L ; v' N u V c> L I /v1 - Ki , w%°i 1-1.2 T 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status?
<br />b) approval for INTERMITTENT OPERATION?
<br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation).
<br />8. Number of acres that were newly affected during the current report year. jf�Ecc-a VZO
<br />9. Number of acres that were reclaimed during the current report year. OCT 22
<br />2013
<br />10. Estimated new acreage to be affected in the next report ear.
<br />g P Y Divi$fon of
<br />11. Estimated acres to be reclaimed in the next report year. 111*1 ,&
<br />Ct.�v- ✓'Pw 1
<br />OE
<br />YES
<br />YES
<br />sc>
<br />NO
<br />(f
<br />Total acres
<br />Permittee Name:
<br />The Cif of Lafayette
<br />Permit Number:
<br />2010 -071
<br />Operation Name:
<br />Goose Haven Reservoir #2- Complex
<br />County:
<br />_M-
<br />Boulder
<br />w /topsoil
<br />Expansion
<br />mulched w/
<br />Annual Fee Due:
<br />$791.00
<br />Anniversary Date:
<br />October 18, 2013
<br />Permit Acreage:
<br />232.00
<br />Current Bond Amt:
<br />$0.00
<br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit
<br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required
<br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is
<br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the
<br />dates for the beginning of active operations, and the date active operations ceased for the year.
<br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance
<br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the
<br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action.
<br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO
<br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO
<br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YESi
<br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3.
<br />4. What was the date of last excavation, processing or hauling activity at the mine?
<br />5. Does the mine operate more than 180 days per year
<br />'�I1f "NO ", please review Rule 1.13 to assure that your /mine is in compliance.
<br />v C� Q � .{ CG-J t.� fi J w� -ru ✓ I -e 5 ,2., L ; v' N u V c> L I /v1 - Ki , w%°i 1-1.2 T 6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status?
<br />b) approval for INTERMITTENT OPERATION?
<br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation).
<br />8. Number of acres that were newly affected during the current report year. jf�Ecc-a VZO
<br />9. Number of acres that were reclaimed during the current report year. OCT 22
<br />2013
<br />10. Estimated new acreage to be affected in the next report ear.
<br />g P Y Divi$fon of
<br />11. Estimated acres to be reclaimed in the next report year. 111*1 ,&
<br />Ct.�v- ✓'Pw 1
<br />OE
<br />YES
<br />YES
<br />sc>
<br />NO
<br />(f
<br />Total acres
<br />e�
<br />Total acres
<br />%U
<br />M(j, �,- i'r y a; SiTC T- h1_ Cf,I 'A5 ,�- z�j. °•' ✓,, :. s
<br />12. Total acres in various stages of reclamation, since permitted mining activities began: J , T
<br />Total acres
<br />Total acres
<br />Total acres
<br />Total acres
<br />backfilled:
<br />seeded w/
<br />w /topsoil
<br />mulched w/
<br />approved mix:
<br />replaced:
<br />approved mulch -
<br />Total acres
<br />Total acres
<br />Topsoil
<br />Mulch application
<br />graded:
<br />fertilized w/
<br />replacement
<br />rate (tons):
<br />a vd fertilizer:
<br />depth (in.):
<br />Seed
<br />Fertilizer
<br />Mulch
<br />application
<br />application
<br />application
<br />method:
<br />method:
<br />method:
<br />Ilk,
<br />
|