Laserfiche WebLink
Project: <br />M <br />T <br />W <br />Client / On Site Rep: <br />F <br />S <br />• ' GEOTECH <br />I X <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability <br />Contractor / Rep: <br />Civil, Structural & Geotechnical Engineers <br />Bowie Resources / Gary Harding <br />222 South Park Ave. • Montrose. CO 81401 <br />Ph.. (970) 249.6828 • FAX: (970) 249.0945 <br />Project No: <br />Date: <br />Technician: <br />2005126-CMT <br />9/16/2013 <br />CONSTRUCTION MATERIALS TESTING <br />G. Jones <br />DAILY <br />COMPACTION REPORT <br />TEST <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />DENSITY <br />MOISTURE <br />DENSITY <br />CONTENT <br />COMPACTION <br />wri-HIN <br />TYPE <br />NUMBER <br />I <br />(pCf) <br />CONT. (ova) <br />(pcf) <br />(%) <br />SPEC <br />933 <br />Pt 5101 (N:19912.81 E:37487.82) <br />6200.4 <br />X <br />95.8 <br />12.4 <br />87.4 <br />10.2 <br />91.2 <br />891/893/894 r/c a�13 <br />934 <br />Pt 5102 (N:19828.48 E:37472.09) <br />6187.9 <br />X <br />95.7 <br />12.5 <br />97.5 <br />15.5 <br />101.9 <br />8911893/894 r/c @14 <br />935 <br />Pt 5103 (N:19695.58 E:37507.20) 1 <br />6170.9 1 <br />X <br />1 <br />1 94.21 <br />10.61 <br />88.01 <br />13.81 <br />93.3 <br />1 <br />1 339/340 r/C @13% <br />MOISTURE / DENSITY SPECIFICATIONS <br />90% Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: IThe Contractor Is: <br />OBSERVATION /TESTING <br />Time: <br />Time: IX <br />ber of Site Visits /Day: <br />:Trig Only: <br />uested By (Company Name): <br />Bowie Resources <br />Insufficient amount <br />of material olaced. <br />Weather: Processing Frozen Material: Processing Wet Material: <br />Malfunction: Stripping and/or Grubbing. Moisture Conditioning Dry Mat'I: <br />Stockpiling Fill- Removing unsuitable Man: <br />Date: <br />Day: <br />FIELD OBSERVATIONS <br />S <br />M <br />T <br />W <br />Th <br />F <br />S <br />(` <br />I X <br />her: Sun Clear Overcast Rain <br />X X X <br />To 32 32 -50 1 50 -70 70 -85 85 Up <br />X <br />Still Mod High <br />X <br />dity: Dry Mod Humid <br />X <br />Tied (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />Copies Given To: <br />05- 126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012 +.xls DCR9- 16 -13gj #933 -935 <br />.ompactlon Equipment Used: <br />AT 815 <br />iheepsfoot: <br />0 <br />:month Drum Roller: <br />libratory: <br />)ther (List Below): = <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />Q <br />PAGE 1 OF 1 <br />