Laserfiche WebLink
Project: Client / On Site Rep: <br />• ' GEOTECH Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers Contractor / Rep: <br />222 South Park Ave. • Montrose, 00 81401 Bowie Resources / Gary Harding <br />Project No: Date: Ph.: (970) 249 -6828 • FAX: (970) 249.0945 Technician: <br />2005126 -CMT 9/9/2013 CONSTRUCTION MATERIALS TESTING G. Jones <br />TEST <br />NUMBER <br />LOCATION GRADE <br />ELEV <br />TEST TYPE I <br />MAX DRY <br />DENSITY <br />(pcf) <br />OPTIMUM <br />MOISTURE <br />CONT. ( %) I <br />DRY <br />DENSITY <br />(Pcf) <br />MOISTURE <br />CONTENT <br />( %) <br />PERCENT <br />COMPACTION <br />NOT <br />Wl[TH11 <br />sPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />I NUMBER <br />NUC <br />SAND <br />929 <br />Pt 5097 (N:19614.95 E:37668.91) <br />6166.0 <br />X <br />1 <br />1 96.0 <br />11.01 <br />87.4 <br />16.7 <br />91.0 <br />Mod <br />356 r/c @13% <br />930 <br />Pt 5098 (N:19786.86 E:37702.24) <br />6170.8 <br />X <br />X <br />94.2 <br />10.5 <br />87.2 <br />15.0 <br />92.6 <br />Humidity: <br />356 r/c @13% <br />931 <br />Pt 5099 (N:19390.77 E:37150.56) <br />6115.9 <br />X <br />96.6 <br />12.5 <br />98.0 <br />10.2 <br />101.5 <br />891/893/894 r/c @13°/ <br />932 <br />Pt 5100 (N:19403.48 E:37053.32) <br />6112.9 <br />X <br />96.31 <br />12.51 <br />94.81 <br />12.91 <br />98.4 <br />891/893/894 <br />MOISTURE / DENSITY SPECIFICATIONS <br />90% Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />OBSERVATION / TESTING <br />Full Time: <br />Part Time: <br />Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: IThe Contractor Is: <br />of Site Visits/Day: <br />IOnly: EKI <br />ited By (Company Name): <br />Bowie Resources <br />Insufficient amount <br />of material placed. <br />FIELD OBSERVATIONS <br />16/2.013 <br />S <br />M <br />T <br />W <br />Rain <br />F <br />1 <br />X <br />I X <br />I <br />I <br />1-1-111 <br />1 <br />1 <br />Weather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />:month Drum Roller: <br />X <br />X <br />X <br />To 32 <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />Temp: <br />X <br />Still <br />Mod <br />High <br />Wind: <br />X <br />Dry <br />Mod <br />FMIC <br />Humidity: <br />X <br />i <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />Copies Given To: <br />dement Weather: Processing Frozen Material: Processing wet Material: <br />uipment Malfunction: stripping and /or Grubbing, Moisture Conditioning Dry Matz: <br />known: Stockpiling Fill: Q Removing Unsuitable Matt: <br />05- 126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012 +.xls DCR9- 9 -13g} #929 -932 <br />.ompaction Equipment Used: <br />AT 815 <br />iheepsfoot: <br />C A <br />:month Drum Roller: <br />libratory: <br />)ther (List Below): = <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />