Laserfiche WebLink
s <br />Project: <br />Date: 9/4/2013 <br />- - -- --- <br />Compaction Equipment Used: <br />Client / On Site Rep: <br />F S <br />S C <br />L9&%=1 Z i0iiCH G <br />Bowie Resources / B. Bear <br />Contractor / Rep: <br />Bowie Mine Gob Pile Stability <br />Civil, Structural & Geotechnicai Engineers <br />heepsfoot: IX <br />Clear <br />Overcast <br />222 South Park Ave. • Montrose, CO 81401 <br />Ph.: (970) 249-6828 • FAX: (970) 249 -0945 <br />Snow <br />Bowie Resources / Gary Harding <br />Project No: <br />Date: <br />Technician: <br />2005126 -CMT <br />9/4/2013 <br />CONSTRUCTION MATERIALS TESTING <br />Smooth Drum Roller <br />G. Jones <br />50 -70 <br />70 -85 <br />DAILY <br />COMPACTION REPORT <br />Temp: To 32 <br />TEST <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />NUMBER <br />X <br />NUC SAND <br />DENSITY <br />MOISTURE <br />DENSITY <br />CONTENT <br />COMPACTION <br />WITHIN <br />TYPE <br />I <br />NUMBER <br />(pcf) <br />CONT. ( %) <br />(pcf) <br />( %) <br />SPEC <br />925 <br />Pt 5093 (N:20140.52 E:37383.22) <br />6223.1 <br />X <br />93.1 <br />11.7 <br />89.3 <br />16.4 <br />96.0 <br />4171418 TIC @12% <br />926 <br />Pt 5094 N:20250.73 E:37369.45) <br />6226.1 <br />X <br />95.5 <br />10.8 <br />88.5 <br />14.5 <br />92.6 <br />356 r/c @12% <br />927 <br />1Pt 5095 (N:19989.71 E:37544.21) <br />6202.3 <br />1 X <br />1 <br />1 94.21 <br />11.21 <br />86.31 <br />18.41 <br />91.71 <br />337A/338 r/c @12% <br />928 <br />IPt 5096 (N:19685.26 E:37788.53) 1 <br />6160.0 1 <br />X <br />1 <br />1 95.41 <br />11.01 <br />90.51 <br />12.11 <br />94.9 <br />417/418 r/c @18% <br />MOISTURE / DENSITY SPECIFICATIONS <br />90% Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />iratory Testing ASTM Cohesive Soils <br />edure: D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />ractor Not Working Due To: The Contractor Is: <br />OBSERVATION / TESTING <br />ull Time: <br />art Time: <br />umber of Site Visits/Day: <br />'esting Only: <br />I <br />equested By (Company Name): <br />Bowie Resources <br />Insufficient amount <br />of material placed. <br />!meat Weather: Processing Frozen Material: Processing Wet Material. <br />pment Malfunction: Strong and /or Grubbing: Moisture Conditioning Dry Matz: <br />sown: Stockpiling Fill: Removing Unsuitable Matt: <br />FIELD OBSERVATIONS <br />Date: 9/4/2013 <br />T W <br />Compaction Equipment Used: <br />Th F <br />F S <br />S C <br />Day: <br />T 815 <br />heepsfoot: IX <br />Clear <br />Overcast <br />Rain <br />Snow <br />Weather: Sun <br />X <br />X <br />Smooth Drum Roller <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />Temp: To 32 <br />X <br />Vibratory: <br />Mod <br />High <br />Wind: still <br />X <br />Other (List Below): Q <br />S M <br />M T <br />T W <br />W T <br />Th F <br />F S <br />S C <br />Humidity: Dry Mod Humid <br />X <br />Informed (Rep of Company) of Test Results: <br />Ron Grimiand (Bowie Resources) <br />Field Copies Given To: <br />2012 +.xis DCR9- 4 -13gj #925 -928 <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />0 <br />PAGE 1 OF 1 <br />