Laserfiche WebLink
Project: <br />I .._ <br />Client / On Site Rep: <br />M <br />T <br />T <br />• ' GEOECH <br />Th <br />Bowie Resources / B. <br />Bear <br />Bowie Mine Gob Pile Stability <br />- " "' <br />Civil, Structural & Geotechnical Engineers <br />Contractor / Rep: <br />222 South Park Ave. • Montrose. CO 81401 <br />Ph.: (970) 249 -6828 • FAX: (970) 249 -0945 <br />Sun <br />Bowie Resources / Gary <br />Harding <br />Project NO: <br />Date: <br />Technician: <br />X <br />2005126 -CMT <br />9/2/2013 <br />CONSTRUCTION MATERIALS TESTING <br />Smooth Drum Roller: <br />G. Jones <br />32 -50 <br />50 -70 <br />DAILY <br />COMPACTION REPORT <br />X <br />Mod <br />TEST <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />NUMBER <br />NUC SAND <br />DENSITY <br />MOISTURE <br />DENSITY <br />CONTENT <br />COMPACTION <br />wrrHIN <br />TYPE <br />NUMBER <br />(Pcf) <br />CONT. (%) <br />(Pcf) <br />( %) <br />SPEC <br />920/914A <br />Retest of 914 Pt 5088 (N:20074.42 E:37549.72) <br />6206.1 <br />X <br />92.7 <br />11.5 <br />92.3 <br />12.4 <br />99.6 <br />330AI335 r/c @11% <br />921 <br />Pt 5089 (N:20158.86 E:37449.13) <br />6222.1 <br />X <br />92.0 <br />11.8 <br />91.S <br />13.2 <br />99.5 <br />417/418 r/c @7% <br />922 <br />Pt 5090 (N:20066.15 E:37424.48) <br />6217.4 <br />X <br />94.5 <br />11.1 <br />87.7 <br />11.3 <br />92.8 <br />337A/338 r/c @11% <br />923 <br />Pt 5091(N:19860.45 E:37464.44) <br />6194.8 <br />X <br />93.6 <br />10.6 <br />88.7 <br />13.6 <br />94.8 <br />339/340 r/c @11% <br />924 <br />Pt 5092 (N:19888.72 E:37664.48) <br />6181.6 <br />X <br />95.3 <br />12.6 <br />88.5 <br />11.7 <br />92.8 <br />89118931894 dc,010% <br />MOISTURE / DENSITY SPECIFICATIONS <br />900/0 Cohesive Soils <br />Cohesionless Soils <br />sture N/A Cohesive Soils <br />juirement: Cohesionless Soils <br />Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMEE <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: lThe Contractor Is: <br />OBSERVATION / TESTING <br />Full Time: <br />Part Time: <br />Number of Site Visits /Day: <br />Testing Only: IZI <br />Requested By (Company Name): <br />Bowie Resources <br />FIELD OBSERVATIONS <br />Z/2013 <br />Compaction Equipment Used: <br />CAT 815 <br />M <br />T <br />W <br />Th <br />F <br />S <br />X <br />Sheepsfoot: <br />Sun <br />Clear <br />Overcast <br />Rain <br />Snow <br />X <br />X <br />Smooth Drum Roller: <br />To 32 <br />32 -50 <br />50 -70 <br />70-85 <br />85 Up <br />X <br />Mod <br />High <br />Vibratory: <br />Still <br />X <br />Other (List Below): <br />S <br />umidity: Dry Mod Humid <br />X <br />Insufficient amount Informed (Rep of Company) of Test Results: <br />of material placed. Ron Grimland (Bowie Resources) <br />Copies Given To: <br />Weather: Processing Frozen Material: Processing Wet Material: <br />Malfunction: Stripping and /or Grubbing: Moisture Conditioning Dry Mat9: <br />Stockpiling Fill: Removing Unsuitable Mat-1: <br />U5- lZb- L..1vl I tsowie mine No. 1 bon File Stability 2012 +.xlS DCR9- 2 -13gj #920 -924 <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />umidity: Dry Mod Humid <br />X <br />Insufficient amount Informed (Rep of Company) of Test Results: <br />of material placed. Ron Grimland (Bowie Resources) <br />Copies Given To: <br />Weather: Processing Frozen Material: Processing Wet Material: <br />Malfunction: Stripping and /or Grubbing: Moisture Conditioning Dry Mat9: <br />Stockpiling Fill: Removing Unsuitable Mat-1: <br />U5- lZb- L..1vl I tsowie mine No. 1 bon File Stability 2012 +.xlS DCR9- 2 -13gj #920 -924 <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />