Laserfiche WebLink
Project: - - Client / On Site Rep: <br />+ 11-G- <br />GEOTECH Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnicaf Engineers Contractor / Rep: <br />222 South Park Ave. • Montrose. CO 81401 Bowie Resources / Gary Harding <br />Project No: Date: Ph.: (970) 249 -W28 • FAX: (970) 249 -0945 Technician: <br />2005126 -CMT 8/28/2013 CONSTRUCTION MATERIALS TESTING G. Jones <br />MOISTURE / DENSITY SPECIFICATIONS <br />action 90% Cohesive Soils <br />rement: Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />OBSERVATION/ TESTING <br />Full Time: <br />Part Time: <br />Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: IThe Contractor Is: <br />of Site Visits /Day: <br />( Only: I <br />sted By (Company Name): <br />Bowie Resources <br />>ufficient amount <br />material Dlaced. <br />Weather: Processing Froaen Material: = Processing Wet Material: <br />Malfunction: Stripping and /or Grubbing: =Masture Conditioning Ory Mat'I: <br />Stockpiling Fill: = Reproving Unsuitable Mat'I: <br />FIELD OBSERVATIONS <br />5 <br />M <br />T <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />TEST <br />LOCATION GRADE <br />LOCATION <br />ELEV <br />mp: <br />X <br />Still <br />NUMBER <br />High <br />NUC FSAND <br />MOISTURE <br />I <br />DENSITY <br />CONTENT <br />COMPACTION <br />wrrHIN <br />TYPE <br />NUMBER <br />Humid <br />mldity: <br />(per <br />CONT. ( %) <br />(pC0 <br />( %) <br />SPEC <br />916 <br />Pt 5084 (N :20004.65 E:37372.78) <br />6209.9 <br />X <br />97.5 <br />11.1 <br />90.0 <br />12.3 <br />923 <br />4171418 r/C @16% <br />917 <br />Pt 5085 (N :20226.54 E:37367.21) <br />6223.7 <br />X <br />94.2 <br />10.8 <br />86.8 <br />10.2 <br />92.1 <br />3391340 r/c @8% <br />918 <br />JPt 5086 (N:20088.77 E:37485.53) 1 <br />6215.6 <br />1 X <br />1 99.01 <br />12.0 <br />91.81 <br />14.7 <br />92.7 <br />891/893/894 <br />919 <br />JPt 5087 (N:19977.41 E:37520.22) 1 <br />6200.5 <br />1 X <br />1 96.31 <br />11.3 <br />88.71 <br />12.61 <br />92.11 <br />1 <br />337A/338 r/C @11% <br />MOISTURE / DENSITY SPECIFICATIONS <br />action 90% Cohesive Soils <br />rement: Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />OBSERVATION/ TESTING <br />Full Time: <br />Part Time: <br />Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />Not Working Due To: IThe Contractor Is: <br />of Site Visits /Day: <br />( Only: I <br />sted By (Company Name): <br />Bowie Resources <br />>ufficient amount <br />material Dlaced. <br />Weather: Processing Froaen Material: = Processing Wet Material: <br />Malfunction: Stripping and /or Grubbing: =Masture Conditioning Ory Mat'I: <br />Stockpiling Fill: = Reproving Unsuitable Mat'I: <br />FIELD OBSERVATIONS <br />5 <br />M <br />T <br />W <br />Th <br />III <br />X <br />X <br />X <br />32 -50 <br />50 -70 <br />70 -85 <br />Lather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />imooth Drum Roller: <br />X <br />X <br />To 32 <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />mp: <br />X <br />Still <br />Mod <br />High <br />nd: <br />X <br />Dry <br />Mod <br />Humid <br />mldity: <br />X <br />I <br />ormed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />eld Copies Given To: <br />05- 126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012 +.xis DCR8- 28 -139j #916 -919 <br />:ompaction Equipment Used: <br />JAT 815 <br />>heepsfoot: <br />Q <br />imooth Drum Roller: <br />libratory: <br />Other (List Below): = <br />Buckhom was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />