My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-22_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2013-10-22_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:25 PM
Creation date
10/22/2013 1:03:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
10/22/2013
Doc Name
3rd Quarter 2013 Wastepile Inspection Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Mine Gob Pile Stability <br />2005126 -CMT 1 8/23/2013 <br />BUCKHOR 1 <br />Civil, Structural & Geotechnical Engineers <br />222 South Park Ave. • Montrose, CO 81401 <br />Ph.:(970)249 -6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING <br />On Site Rep: <br />Bowie Resources / B. Bear <br />for / Rep: <br />Bowie Resources / Gary Hardi <br />ian: <br />G. ]ones <br />MOISTURE / DENSITY SPECIFICATIONS <br />900/0 Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />Laboratory Testing ASTM Cohesive Soils <br />Procedure: D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />THIS DATE FOR THE FOLLOWING REASONS: <br />ontractor Not Working Due To: IThe Contractor Is: <br />!ment Weather: <br />pment Malfunction: <br />(Unknown: <br />Processing Frozen Material <br />and /or Grubbing: <br />Fill: <br />OBSERVATION / TESTING <br />Time: <br />Time: �X <br />ber of Site Visits /Day: <br />:ing Only: EX <br />uested By (Company Name): <br />Bowie Resources <br />Insufficient amount <br />of material placed. <br />Processing Wet Material: <br />Moisture Conditioning Dry Mati: <br />Removing Unsuitable MaYI: <br />FIELD OBSERVATIONS <br />S <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />DENSITY <br />(pcf) <br />OPTIMUM <br />MOISTURE <br />CONT. ( %) <br />DRY <br />DENSITY <br />(pcf) <br />MOISTURE <br />CONTENT <br />( %) <br />PERCENT <br />COMPACTION <br />NOT <br />WITHIN <br />SPEC <br />SOIL <br />TYPE <br />LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />kTEST <br />Pt 5080 (N:20134.51 E:37380.10 <br />X <br />1 <br />95.8 <br />11.5 <br />92.2 <br />14.6 <br />96.2 <br />Mod <br />337A +338 r/c @8% <br />Wind: <br />Pt 5081 (N:20124.71 E:37473.56) <br />X <br />X <br />96.2 <br />10.5 <br />90.3 <br />13.7 <br />93.9 <br />Humidity: <br />339 +340 r/c @12% <br />Pt 5082 (N:20072.83 E:37550.80) <br />X <br />102.1 <br />11.6 <br />90.5 <br />11.6 <br />88.6 <br />X <br />891/893/894 r/c @20% <br />Pt 5083 (N:20007.34 E:37605.80) <br />X <br />99.61 <br />12.11 <br />90.31 <br />11.31 <br />90.7 <br />891/893/894 r/c <br />MOISTURE / DENSITY SPECIFICATIONS <br />900/0 Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />Laboratory Testing ASTM Cohesive Soils <br />Procedure: D698 <br />Cohesionless Soils <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />THIS DATE FOR THE FOLLOWING REASONS: <br />ontractor Not Working Due To: IThe Contractor Is: <br />!ment Weather: <br />pment Malfunction: <br />(Unknown: <br />Processing Frozen Material <br />and /or Grubbing: <br />Fill: <br />OBSERVATION / TESTING <br />Time: <br />Time: �X <br />ber of Site Visits /Day: <br />:ing Only: EX <br />uested By (Company Name): <br />Bowie Resources <br />Insufficient amount <br />of material placed. <br />Processing Wet Material: <br />Moisture Conditioning Dry Mati: <br />Removing Unsuitable MaYI: <br />FIELD OBSERVATIONS <br />S <br />M <br />T <br />W <br />TI <br />F <br />S <br />X <br />I <br />I <br />I <br />I <br />I X <br />I <br />Weather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />X <br />X <br />To 32 <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />Temp: <br />1 <br />1 X <br />Still <br />Mod <br />High <br />Wind: <br />X <br />Dry <br />Mod <br />Humid <br />Humidity: <br />X <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />Field Copies Given To: <br />Contractor: <br />Client: <br />CM /GM: <br />Other: <br />05- 126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012 +.xis DCR8- 23 -13gj #912 -915 <br />,ompaction Equipment Used: <br />:AT 815 <br />iheepsfoot: �X <br />mooth Drum Roller: <br />(ibratory: <br />)ther (List Below): <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.