Laserfiche WebLink
Project: <br />_...___.._........_...- ...._._i <br />' GEOTECH <br />Date: <br />Client / On Site Rep: <br />I <br />Day: <br />Bowie Resources / B. Bear <br />Contractor/ Rep: <br />Bowie Mine Gob Pile Stability <br />Civil, Structural & Geotechnical Engineers <br />Bowie Resources /Gary Harding <br />Weather: <br />Sun Clear <br />222 South Park Ave. - Montrose. CO 81401 <br />Ph.: (970) 249 -6828 - FAX: (970) 249.0945 <br />Snow <br />Project No: <br />Date: <br />Technician: <br />2005126 -CMT <br />7/17/2013 <br />CONSTRUCTION MATERIALS TESTING <br />To 32 32 -50 <br />G. Jones <br />DAILY <br />COMPACTION REPORT <br />X <br />Vibratory: <br />TEST <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY <br />OPTIMUM <br />DRY <br />MOISTURE <br />PERCENT <br />NOT <br />SOIL <br />LAB SAMPLE <br />NUC <br />SAND <br />NUMBER <br />DENSITY <br />MOISTURE <br />DENSITY <br />CONTENT <br />COMPACTION <br />Wrrw <br />TYPE <br />NUMBER <br />(Pcf) <br />CONT. (%) <br />(pcf) <br />( %) <br />SPEC <br />872/755C <br />Retest 755B Pt. 5040/872 (N: 19619.59 - E: 37797.18) <br />6148.8 <br />X <br />94.7 <br />11.4 <br />86.0 <br />14.0 <br />90.8 <br />417/418 r/c @14% <br />873 <br />Pt. 5041 (N: 19313.74 - E: 37131.36) <br />6099.8 <br />X <br />102.8 <br />10.5 <br />93.1 <br />13.0 <br />90.6 <br />354/355 r/c @17% <br />874 <br />Pt. 5042 (N: 19360.15 - E: 37060.67) <br />6101.0 <br />X <br />96.91 <br />10.41 <br />92.51 <br />14.11 <br />95.5 <br />1 <br />1339/340 r/c @14% <br />MOISTURE / DENSITY SPECIFICATIONS <br />900/0 Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />y Testing ASTM Cohesive Soils <br />D698 <br />Cohesionless Soils <br />/ COMPACTION TESTING WAS NOT PERFORMED <br />THIS DATE FOR THE FOLLOWING REASONS: <br />r Not Working Due To: IThe Contractor Is: <br />Weather: Processing Frozen Material <br />t Malfunction: Stripping and /or Grubbing: <br />Stockoihna Fill: <br />OBSERVATION / TESTING <br />Full Time: <br />Part Time: <br />Number of Site Visits/Day: <br />Testing Only; <br />Requested By (Company Name): <br />Bowie Resources <br />Insufficient <br />of material <br />wet Material: <br />[[�--Moisture Conditioning Dry Marl: <br />k�Removing Unsuitable Matz: <br />05 -126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012+ DCR7- 17 -13gj #872 <br />5 <br />FIELD OBSERVATIONS <br />Date: <br />7/17/2013 <br />Compaction Equipment Used: <br />Day: <br />M T <br />W Th F <br />5 <br />CAT 815 <br />Sheepsfoot: F7X <br />Weather: <br />Sun Clear <br />Overcast Rain <br />Snow <br />X <br />Smooth Drum Roller: <br />Temp: <br />To 32 32 -50 <br />50 -70 70 -85 85 Up <br />X <br />Vibratory: <br />Wind: <br />still <br />Mod High <br />X <br />Other (List Below): <br />5 <br />X <br />Humidity: Dry Mod Humid <br />X <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />Field Copies Given To: <br />Buckhorn was not informed prio <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF 1 <br />