Laserfiche WebLink
Project: Client / On Site Rep: <br />GEOTECH <br />f Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability Civil, Structural & Geotechnical Engineers Contractor / Rep: <br />222 South Park Ave. • Montrose. Co 81401 <br />Bowie Resources /Gary Harding <br />Project No: Date: Ph.: (970) 249 -6828 • FAX, (970) 249 -0945 Technician: <br />2005126 -CMT 7/10/2013 CONSTRUCTION MATERIALS TESTING B. Heckard <br />DAILY COMPACTION REPORT <br />TEST <br />NUMBER <br />LOCATION <br />GRADE ELEV <br />TEST TYPE <br />MAX DRY I <br />DENSITY <br />(pco <br />OPTIMUM <br />MOISTURE <br />CONT. ( %) <br />DRY <br />DENSITY <br />(per <br />MOISTURE <br />CONTENT <br />( %) <br />PERCENT I <br />COMPACTION <br />NOT <br />wrrHIN <br />SPEC <br />SOIL <br />TYPE <br />I LAB SAMPLE <br />NUMBER <br />NUC <br />SAND <br />862 <br />Pt. 5030 (N: 19305.38 - E: 37097.15) <br />6093.1 <br />X <br />Stnppmg and /or Grubbing <br />96.2 <br />11.3 <br />89.6 <br />15.9 <br />93.1 <br />Stockpiling Fill: <br />Removing Unsuitable Mafl: <br />417/418 r/c @14% <br />863 <br />Pt. 5031(N: 19396.91- E: 37084.11) <br />6105.1 <br />X <br />95.7 <br />11.5 <br />90.7 <br />13.2 <br />94.8 <br />Humidity: <br />417/418 r/c @13% <br />864 <br />Pt. 5032 (N: 19376.22 - E: 37224.96) <br />6115.3 <br />X <br />95.1 <br />11.51 <br />91.71 <br />13.8 <br />96.4 <br />417/418 r/c @110/6 <br />MOISTURE / DENSITY SPECIFICATIONS <br />900/0 Cohesive Soils <br />Cohesionless Soils <br />N/A Cohesive Soils <br />Cohesionless Soils <br />OBSERVATION / TESTING <br />Bowie Resources <br />Full Time: <br />W <br />Part Time: <br />F7 <br />Number of Site Visits /Day: <br />F 17 <br />Testing Only: <br />Requested By (Company <br />Name): <br />y Testing ASTM Cohesive Soils <br />Bowie Resources <br />D698 <br />W <br />Cohesionless Soils <br />F <br />DENSITY /COMPACTION TESTING WAS NOT PERFORMED 7Insufficiem: <br />amount <br />ON THIS DATE FOR THE FOLLOWING REASONS: <br />mate placed. <br />r Not Working Due To: <br />The Contractor Is: <br />— <br />: Weather: <br />Processing Frozen Material: <br />Processing Wet Material: 1 <br />t Malfunction: <br />Stnppmg and /or Grubbing <br />Moisture Conditioning Dry Marl: <br />X <br />Still <br />Stockpiling Fill: <br />Removing Unsuitable Mafl: <br />Date: <br />Day: <br />FIELD OBSERVATIONS <br />S <br />M <br />T <br />W <br />Th <br />F <br />S <br />I <br />I <br />I X <br />I <br />I I <br />— <br />Weather: <br />Sun <br />Clear <br />Overcast <br />Rain <br />X <br />To 32 <br />32 -50 <br />50 -70 <br />70 -85 <br />85 Up <br />Temp: <br />X <br />Still <br />Mod <br />High <br />Wind: <br />X <br />Dry <br />Mod <br />Humid <br />Humidity: <br />X <br />Informed (Rep of Company) of Test Results: <br />Ron Grimland (Bowie Resources) <br />05 -126 -CMT Bowie Mine No. 2 Gob Pile Stability 2012+ DCR7-10 -13bh #862 <br />Copies Given To: <br />:ompaction Equipment Used: <br />:AT 815 <br />iheepsfoot: <br />imooth Drum Roller: <br />Abratory: <br />Dther (List Below): <br />Buckhom was not informed prio <br />to our arrival on site that the <br />contractor would not be working <br />on this date. <br />PAGE 1 OF I <br />