provides no vegetative buffer below the waste dump (which the nearby sediment pond 3 <br />possesses) so the use of sediment control structure will be needed. Since these are <br />normally temporary, such as woven silt fencing or straw wattles, please commit to <br />closely monitoring and maintaining them. <br />All temporary sediment structures will be closely monitored and maintained and is stated <br />in Appendix 13. <br />26. The outslope will be a 3:1 gradient, which is adequate to provide stability for this coarse <br />material. The reclamation is for the eventual revegetation of the area. Since the new <br />waste rock will occupy land that may contain some topsoil, please commit to salvaging <br />any available topsoil prior to placement of the waste rock. (Please ensure that the <br />permit boundary is clearly marked, and the disturbed area boundary is the limit of where <br />the waste rock is placed.) <br />All topsoil encountered will be removed and stockpiled. The permit boundary is clearly <br />marked and the waste rock will be placed within the disturbance boundary. <br />27. The additional buildings described in the plan are consistent with the mining plan and the <br />development of the mine and mill. It is understood that certain of the structures could <br />continue to exist after reclamation as general storage. Does the county have to inspect <br />or approve any of the structures before they can be permanent on the site? <br />No, Ouray County does not need to inspect or approve any of the structures that will <br />remain on site after reclamation. <br />28. The reclamation plan map (Map F -1) clearly shows which building structures will remain <br />after reclamation. The two buildings presently proposed to remain as permanent <br />structures are the filter building and the mine equipment storage and shop building. <br />Please describe what the building's contents will be, and what building clean -up or <br />disposal of contents will be required at the time of reclamation. <br />The removal of inside equipment and piping is addressed in the revised Exhibit L, which <br />is enclosed. <br />29. The Division will recalculate the bond after receiving your responses. The changes <br />proposed under this revision may affect the bond amount for the permit. The new <br />figures will be forwarded to you and the operator when they are completed. Any <br />increase in the amount of bond for this revision must be submitted within 60 days after <br />notification by the Division, and until it is received and accepted the revision will not <br />become final. <br />The new bond amount will be submitted within 60 days of notification by the Division. <br />In addition to the changes described above, pages reflecting changes to Exhibit L for the <br />structure inventory and also changes to Collection Ditch #3 have resulted in a resubmittal of <br />7 <br />