Laserfiche WebLink
SWB -6D TC.tXt <br />Time of concentration (scs) Tue Nov 20 15:50:23 2012 <br />Project: SWB -6D <br />Location: Revenue Mine <br />Developed <br />By: B Langenfeld Date: 11/20/12 <br />Checked: Date: <br />Curve Number: 75 <br />Length of Flow: 784.33 ft <br />Average Land slope: 10.28 % <br />Time of concentration: 0.158 hrs, 9.5 mins <br />Page 1 <br />