Laserfiche WebLink
Table L -2: Building Inventory and Cost Summary of Building Removal <br />Revenue Mine September 2013 L -7 <br />Post Mine <br />Reclamation <br /># <br />Structure <br />Construction <br />Foundation <br />Permanent <br />Use <br />Cost <br />1 <br />Office /Dry Building <br />2 story <br />6" concrete slab /w rebar <br />Yes but remove certain <br />Storage <br />$ 2400 <br />inside items <br />2 <br />Filter Building <br />2 story 6" concrete walls <br />12" concrete slab/ w rebar <br />Yes but remove inside <br />Storage <br />$ 4000 <br />equipment <br />3 <br />500 gal Wa er Tanks <br />Plastic 500 gallon tanks <br />None <br />No <br />None <br />$ 600 <br />4 <br />Snow Shed /Battery <br />45' x 120' with track with <br />6" slab concrete <br />Yes but remove inside <br />Storage <br />$ 1400 <br />Charger Bldg <br />metal siding <br />equipment <br />5 <br />Crusher Retaining <br />28 ft long x 16 ft high <br />Wood beams and steel <br />No <br />None <br />$ 4000 <br />Wall <br />beams <br />6 <br />Septic Tank /Septic <br />Yes <br />None <br />$ 0 <br />Field <br />� <br />Access Road Retaining <br />100 ft long gabions <br />None <br />Yes <br />Site Access <br />$ 0 <br />Wall <br />8 <br />Miscellaneous Surface <br />Various materials on site <br />None <br />No <br />None <br />$ 3500 <br />Cleanup <br />9 <br />8000 gal diesel tank <br />Steel tank on skids <br />None <br />No <br />None <br />$ 500 <br />10 <br />1 Propane Tanks <br />None <br />No <br />None <br />$ 300 <br />11 <br />Mine Equipment <br />145'x 50' Quonset Hut <br />6" foundation to be <br />Building No, Slab Yes <br />None <br />$ 2000 <br />Storage /Shop <br />covered /reclaimed <br />12 <br />Switchgear Building <br />25'x 30' <br />Concrete slab <br />Yes <br />Electrical <br />$ 0 <br />use <br />Total <br />$18,700 <br />Revenue Mine September 2013 L -7 <br />