My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-21_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2013-10-21_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:21 PM
Creation date
10/21/2013 10:00:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Revision
Doc Date
10/21/2013
Doc Name
Adequacy Review No. 2
From
DRMS
To
Goff Engineering & Surveying, Inc.
Type & Sequence
TR17
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R Harries, Goff Engineering <br />C -1992 -080 TR -17 PAR No. 2 <br />21 -Oct -2013 <br />Page 4 of 5 <br />Channel will not be restored to its original configuration, this page should be eliminated <br />or revised to indicate that the design will not be implemented. <br />DRMS 10121: Revising the sixth page of Appendix 5-2 will be handled under the RN- <br />04 process. <br />6. DRMS 09120: The design information and maps provided with the technical revision <br />application have not been certified by a registered professional engineer. Please provide <br />the required certification for all of the maps, cross - sections, and plans submitted (Rules <br />2.10.3(2) and 4.05.4(2)). <br />DBMS 10118: This item has been resolved; the maps, cross sections, and plans have <br />been certified <br />7. DRMS 09120: The design event requirements for the Carbon Junction channel are as <br />follows: <br />• Unnamed tributary to Carbon Junction Channel —10 yr -24 hr (Rule 4.05.3) <br />• Carbon Junction Channel upstream of the Carbon Junction Diversion Channel 10 yr - <br />24 hr (Rule 4.05.3) <br />• Permanent Diversion of Carbon Junction around the fill —100 yr — 24 hr (Rule 4.09) <br />DRMS 10121: No response was required <br />8. DRMS 09/20: It will likely be necessary to extend the rip rap upstream of the Permanent <br />Carbon Junction Diversion Channel to ensure that flow from Carbon Junction is directed <br />to the Permanent Carbon Junction Diversion Channel and not in the direction of the <br />former East Diversion. <br />DRMS 10/21: A rip rap bank stabilization design has been proposed to ensure that <br />runoff from the Upper Carbon Junction Channel is directed to the Carbon Junction <br />Permanent Diversion. This appears to be an appropriate proposal, but eh placement <br />(grade and length) should be verified in the field field fit) to determine whether it <br />extends far enough to ensure that flow is diverted off of the permanent fill and away <br />from the East Diversion Channel. <br />9. DRMS 09/20: Maps and text provided with the application indicate that the riprapped <br />permanent diversion ends at Station 20 +20—. A comparison with aerial photos of the area <br />appears to show that the riprap extends further upstream, to Station 23 +00 —. Please <br />review, and revise the application as appropriate. <br />DRMS 10121: This item is resolved,: the maps have been revised as requested. <br />10. DRMS 09/20: No elevation labels have been provided for the contour lines on the <br />various maps. Please include this information, together with the dates the contour data <br />was collected. <br />DRMS 10/21: This item is resolved; the maps have been revised as requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.