My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-21_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2013-10-21_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:34:21 PM
Creation date
10/21/2013 10:00:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Revision
Doc Date
10/21/2013
Doc Name
Adequacy Review No. 2
From
DRMS
To
Goff Engineering & Surveying, Inc.
Type & Sequence
TR17
Email Name
MLT
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />21 October 2013 <br />Rob Harries, P.E. <br />Goff Engineering & Surveying, Inc. <br />126 Rock Point Drive <br />P.O. Box 97 <br />Durango, Colorado 81302 <br />Re: Carbon Junction Mine — Permit No. C -1992 -080 <br />Technical Revision No. 17 (TR -17) — Response to Notice of Violation <br />Preliminary Adequacy Review No. 2 <br />Dear Mr. Harries: <br />COLORADO <br />D I V I S IOM OF <br />RECLAMATION <br />MINING <br />e <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pifleda <br />Director <br />The Division issued a Preliminary Adequacy Review for TR -17 on September 20, 2013. The <br />letter was re- issued on October 11 to acknowledge Goff s recent discovery of text and maps <br />comprising Appendices 5 -9 and 5 -10, which were incorporated into the permit under Technical <br />Revision No. 6 (TR -06) in 1997. <br />A response to the review, prepared by your office, was received on October 15, 2013. The <br />package included the following items: <br />:> Cover letter dated October 7, 2013, application form, and proposed public notice (the <br />form and public notice do not need to be submitted more than once, and do ,not, <br />themselves, become part of the permit); <br />y "Appendix A ", which includes: <br />o May 7, 2007 memo from Goff Engineering to Mike Savage regarding the flow <br />capacity of the culverts installed beneath the permanent haul road (it is not <br />necessary to resubmit this document, as nothing changed from the original <br />application) <br />o HEC -RAS analysis for 100 -year event (Carbon Junction Permanent <br />Diversion) <br />I "Appendix B ", which included: <br />o HydroCAD description of drainage basins and runoff for Upper Carbon <br />Junction Channel (10 -year event) <br />o HEC -RAS analysis for 10 -year event (Upper Carbon Junction Channel) <br />�, "Appendix C ", which included: <br />o HydroCAD description of drainage basin for Un -named Tributary (10 -year <br />event) <br />Office of Office of <br />Mined land Reclamation Denver # Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.