My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-17_PERMIT FILE - M2013007 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013007
>
2013-10-17_PERMIT FILE - M2013007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:33:34 PM
Creation date
10/18/2013 2:45:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013007
IBM Index Class Name
PERMIT FILE
Doc Date
10/17/2013
Doc Name
Permit Issuance letter
From
DRMS
To
Operator
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />October 17, 2013 <br />STATE OF COLORADO <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mr. Zane Luttrell Mike King <br />Rocky Mountain Aggregate & Construction, LLC Executive Director <br />23625 Uncompahgre Rd <br />Loretta E Pineda <br />Montrose, CO 81401 <br />Director <br />Re: Uncompahgre Pit, Permit No. M- 2013 -007, Permit Issuance - Construction Material Operation <br />Dear Mr. Luttrell: <br />On October 17, 2013 the Division of Reclamation, Mining and Safety found Rocky Mountain Aggregate & Construction, <br />LLC to have satisfied the applicable requirements of C.R.S. 34- 32.5 -101 et seMc . for obtaining a mining and reclamation <br />permit. Therefore, a permit is being issued. Two signed originals of the permit have been executed. We have kept one <br />copy for our files and are enclosing one copy for your use. It is your responsibility to comply with all of the terms of the <br />permit. <br />1. All of the original application materials, as amended and supplemented, are an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the permit <br />application at the mining operation as a reference for operating personnel, to help ensure compliance with the terms of the <br />permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may require a <br />modification to the permit. We suggest consulting the Construction Materials Rules and Regulations and/or contacting us <br />to determine if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical Revisions, <br />and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each year, October 17, you must submit an annual fee and an annual report to <br />us. The annual fee for this permit is $791.00. Please consult the Act, Rules and Regulations, and your permit for specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact the Division. <br />Sincerely, <br />LORETTA E. PINEDA <br />Division Director <br />Enclosure <br />Certified Mail No. 7010 1060 0001 0936 6194, return receipt requested <br />cc: Wally Erickson, Division of Reclamation, Mining and Safety <br />Greg Lewicki, Greg Lewicki and Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.