My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-02_PERMIT FILE - C1981019A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019A
>
2013-10-02_PERMIT FILE - C1981019A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:59 PM
Creation date
10/18/2013 8:51:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/2/2013
Section_Exhibit Name
Rule 2 Permits -ST
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 2 PERMITS <br />.._ .__ . ~ ,~~,.._ ,___ _,- r. ,.. _-~„ <br />• The truck/shovel operation will be used to open up the initial boxcar, and then will be generally utilized in <br />removing overburden over the upper coal seams. In some areas of the pit the truck/ shovel will be utilized <br />by taking all seams from the "X3" to the "GS" (X3, X4, B0, B 1, B2, B3, C5, D 1, D2, E2, Fl, F6, F7, FA, <br />FB, G7 and G8). In the dragline portions of the pit the dragline will generally uncover the "F6" through <br />the "G8" (F6, F7, FA, FB, G7 and G8). From time to time, based on production requirements, <br />truck/shovel or loader/truck methods may be utilized to assist the dragline operation in the lower seams. <br />The overburden material is removed in a series of lifts or benches; the height of these benches will be <br />influenced by the distance between the coal seams to be mined (see Map 24B, Mining Range Diagrams), <br />and the equipment mining those benches. <br />Overburden removal by the, truck/shovel method progresses on approximately 170-240 foot wide <br />benches and has a maximum highwall height of about 60 feet. Electric shovels or front-end loaders load <br />this overburden into 50, 170, 190 or 240-ton trucks. The trucks then haul the overburden azound the <br />active coal pit and dump this material into the mined-out or stock pile areas. The truck/shovel operation <br />will always precede the dragline operation in the multiple seam pits. <br />A Marion 8050 dragline will be used for overburden removal over the lower coal seams and the <br />generalized multi-seam dragline sequence at the Colowyo operation is as follows: <br />The Marion 8050 dragline will begin the sequence by removing the overburden over the "F6" through the <br />"FA" seams in a single sidecast mode, spoiling the overburden into the previously mined-out pit. The <br />"FB" through the "G8" is removed from the spoil side of the pit. The spoil from the benching operation <br />will be placed to allow the draglines sufficient room and adequate reach to remove overburden while <br />• operating on the spoil side. The draglines construct temporary ramps in order to walk to the spoil side. <br />The "F6" overburden is fast drilled and blasted, removed by the draglines, "F6" coal is removed behind <br />the advance of the draglines, then the drilling is initiated on the overburden of the "F7" seam. This <br />sequence is typical through the "G8" seam. With the dragline only mining through the F6 and below <br />spoil, it will ensure that any suspect level spoil, based upon the suitability criteria, will stay in the bottom <br />of the pit and will buried by a minimum of 50 foot of suitable Truck Shovel material. <br />Upon complete removal of the overburden over the "G8" seam, the draglines walk azound the end of the <br />pit to the next cut to begin removal of the overburden over "F6" coal seam. <br />L J <br />SoutF~ Taylor/Lower Wilson -Rule 2, Page 91 Revision Date: 3/30107 <br />Revision No.: PR-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.