Laserfiche WebLink
RULE 2 PERMITS <br />Public Notice of Blasting Schedule <br />Colowyo will republish a blasting schedule similar to the one set forth in Volume 1, Section 2.05, <br />Figure 1 — Public Notice of Blasting Schedule. <br />Disposal of Excess Spoil <br />Colowyo will construct two separate "valley fills" which will be called the East Taylor Fill and <br />the West Taylor Fill. These fills are necessary due to the early operation of the South Taylor <br />mining area; overburden will need to be placed into the fills so that sufficient working area can be <br />developed prior to the placement of subsequent overburden into the mined -out areas. <br />Detailed geotechnical investigations were completed for both the East Taylor Fill and the West <br />Taylor Fill by Shannon & Wilson, Inc. A report of the investigations can be found in Exhibit 21 <br />Item 1. Construction plans for the fills, addressing the requirements of Rule 4.09, Disposal of <br />Excess Spoil, can also be found in Section 4.09 and Exhibit 21, Item 1. Locations of the East <br />Taylor Fill and West Taylor Fill can be found in Exhibit 21, Item 1 and on Map 23A. <br />South Taylor /Lower Wilson — Rule 2, Page 102 Revision Date: 12/6/10 <br />Revision No.: TR -81 <br />