Laserfiche WebLink
RULE 2 PERMITS <br />RULE 2 -PERMITS <br />2.01 GENERAL REQUIREMENTS <br />The information provided in the subsections of Rule 2.01 of the original permit is specifically applicable <br />to the South Taylor/L.ower Wilson permit revision area. Information regarding the existing Colowyo <br />Mine permit area is located in Rule 2 of Volume 1 and other referenced areas. <br />2.01.1-2.01.3 Scope and General Requirements <br />These sections are addressed in the existing permit, Rule 1, Volume <br />2.01.4 Permit Requirements for New Surface Coal Mining and Reclamation Operations <br />The Colowyo Mine is an existing mine operation; therefore, the requirements of this Section are not <br />applicable. <br />2.01.5 Permit Term <br />Colowyo is hereby submitting the information necessary for the Division to make a finding that the South <br />Taylor/Lower Wilson Mining Area permit revision extending mining operations to areas inside Federal <br />Coal Leases C-29225, C-29226, and C-0123476 is complete for the life-of-mine. With approval of this <br />application, Colowyo is requesting approval of the entire permit area which also represents the life-of- <br />mine area. Consistent with this approach, the revised permit area will have the right of renewal for <br />successive five-year permit terms. The current permit term is November 5, 2002 to November 5, 2007. <br />2.01.6 Permit Fees <br />As required, Colowyo previously submitted a permit fee of $2,500. Colowyo's existing permit area is <br />approximately 7,402 acres. The total permit area will be expanded by 6,050 acres with the addition of the <br />South Taylor/Lower Wilson permit revision area. <br />I• <br />South Taylor/Lower Wilson -Rule 2, Page 1 Revision Date: 11/30/06 <br />Revision No.: PR-02 <br />