Laserfiche WebLink
RULE 2 PERMITS <br />Operation Conducted in Compliance with 4.23 <br />While performing highwall mining, Colowyo will meet all applicable requirements of the Rules, and <br />the operation will be conducted in compliance with 4.23. <br />2.06.10 Coal Processing Plans and Support Facilities Not Located Within the Permit Area <br />This Subsection does not apply to the coal mining operations planned by Colowyo. <br />2.06.11 In -Situ Processing Activity <br />This Subsection is not applicable to the mining operations planned by Colowyo. <br />Rule 2 Permits 2.06 -10 Revision Date: 10/18/13 <br />Revision No.: TR -100 <br />